Which product recycling requirement applies specifically to LEED AP® Operations and Maintenance Schools and Hospitality?
Which product recycling requirement applies specifically to LEED AP® Operations and Maintenance Schools and Hospitality?A . FoodB . Batteries and lampsC . Electric powered equipmentD . Office equipment, appliances and audiovisual equipmentView AnswerAnswer: A Explanation:
How many occupants should be entered into Portfolio Manager for the vacant office space?
An office building has an average annual occupancy of 75% and 30,000 ft2 (2 787 m2) of completely vacant space. How many occupants should be entered into Portfolio Manager for the vacant office space?A . Zero occupantsB . 100 occupantsC . 150 occupantsD . 200 occupantsView AnswerAnswer: A Explanation: The...
In order for a project team to meet the requirements of Indoor Environmental Quality Credit, Integrated Pest Management, how much advanced notice to building occupants is needed after the emergency application of a pesticide other than the least toxic pesticide?
In order for a project team to meet the requirements of Indoor Environmental Quality Credit, Integrated Pest Management, how much advanced notice to building occupants is needed after the emergency application of a pesticide other than the least toxic pesticide?A . 12 hoursB . 24 hoursC . 48 hoursD ....
One tenant occupying 50% of a commercial office building pursuing LEED® O+M certification has provided purchasing data. The other tenants in the building occupying the remaining 50% have chosen not to provide purchasing data.
One tenant occupying 50% of a commercial office building pursuing LEED® O+M certification has provided purchasing data. The other tenants in the building occupying the remaining 50% have chosen not to provide purchasing data. For credits related to purchasing, the LEED applicant mustA . estimate the purchases of the other...
Key functional and operational parameters such as occupied hours of a building, use by space type, required temperature settings, and lighting levels, are specified in the
Key functional and operational parameters such as occupied hours of a building, use by space type, required temperature settings, and lighting levels, are specified in theA . Basis of DesignB . Design NarrativeC . Owner Project RequirementsD . Current Facility RequirementsView AnswerAnswer: C Explanation: The Owner Project Requirements (OPR) is...
Which of the following is a feature of the ENERGY STAR® Portfolio Manager?
Which of the following is a feature of the ENERGY STAR® Portfolio Manager?A . Requires input of 36 months of dataB . Requires ISO 14001 complianceC . Requires calculation and input of site energy usageD . Requires California Title 24 complianceView AnswerAnswer: C Explanation: The ENERGY STAR® Portfolio Manager is...
At a minimum, what should be included in the Cx Plan?
A project owner has hired a Commissioning Authority (CxA) to develop a Commissioning (Cx) Plan which will be submitted in the LEED application to document Energy and Atmosphere Credit, Existing Building Commissioning - Analysis, Option 1. Existing Building Commissioning. At a minimum, what should be included in the Cx Plan?A...
An essential goal of retro commissioning, re-commissioning, or on-going commissioning for a building's energy using systems is to
An essential goal of retro commissioning, re-commissioning, or on-going commissioning for a building's energy using systems is toA . reduce CFC-based refrigerants in HVAC&R base building systemsB . produce a master list of findings related to the commissioning processC . execute an energy audit that meets requirements of ASHRAE Level...
When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management - Ongoing, which strategy may be used to document total and diverted waste?
When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management - Ongoing, which strategy may be used to document total and diverted waste?A . Measure and document waste in weight or volumeB . Use replacement value as the metric for ongoing wasteC . Extrapolate...
Which of the following would be the lowest cost option?
The project team has been directed by the building owner to only pursue practices that directly improve the actual building performance. Which of the following would be the lowest cost option?A . Install a new high-efficiency chillerB . Purchase renewable energy creditsC . Install new high efficiency urinal flush valvesD...