Which of the following service certifications would assist the existing building in achieving Indoor Environmental Quality Credit, Integrated Pest Management?
A property manager is evaluating various bids from pest management services. Which of the following service certifications would assist the existing building in achieving Indoor Environmental Quality Credit, Integrated Pest Management?A . GreenPro, Ecowise, GreenshieldB . Quality Pro, Ecowise, GreenshieldC . San Francisco Tier 3, CRI, Green SealD . Green...
When conducting the Indoor Environmental Quality Credit, Occupant Comfort Survey what is the minimum percentage of building occupants that must respond?
When conducting the Indoor Environmental Quality Credit, Occupant Comfort Survey what is the minimum percentage of building occupants that must respond?A . 10%B . 20%C . 30%D . 40%View AnswerAnswer: C Explanation: The Indoor Environmental Quality Credit, Occupant Comfort Survey is a tool used to assess the performance and success...
What credit rewards customers who change their normal consumption patterns in response to the varying price of energy over time?
What credit rewards customers who change their normal consumption patterns in response to the varying price of energy over time?A . Energy and Atmosphere Credit, Demand ResponseB . Energy and Atmosphere Credit, Ongoing CommissioningC . Energy and Atmosphere Credit, Advanced Energy MeteringD . Energy and Atmosphere Credit, Green Power and...
What is the allowed maximum tenant space exclusion for Energy and Atmosphere Prerequisite, Minimum Energy Performance?
What is the allowed maximum tenant space exclusion for Energy and Atmosphere Prerequisite, Minimum Energy Performance?A . 10% of the vacant spaceB . 10% of the gross floor areaC . 10% of the project site areaD . 10% of the regularly occupied areaView AnswerAnswer: B Explanation: The LEED AP Operations...
What is the Simple Payback Period for this improvement?
An equipment upgrade requires an initial investment of $1,500.00 USD with a total annual savings of $500.00 and a 33% rate of return. What is the Simple Payback Period for this improvement?A . 120 daysB . 495 daysC . Two yearsD . Three yearsView AnswerAnswer: C Explanation: The Simple Payback...
An ASHRAE Level 1 walkthrough analysis contributes to what prerequisite or credit?
An ASHRAE Level 1 walkthrough analysis contributes to what prerequisite or credit?A . Energy and Atmosphere Prerequisite, Building-Level Energy MeteringB . Energy and Atmosphere Credit, Enhanced Refrigerant ManagementC . Energy and Atmosphere Prerequisite, Minimum Energy PerformanceD . Energy and Atmosphere Prerequisite, Energy Efficiency Best Management PracticesView AnswerAnswer: D Explanation: An...
What equipment must be commissioned to meet the requirements of Energy and Atmosphere Credit, Existing Building Commissioning - Analysis, Option 1. Existing Building Commissioning?
A district energy system provides chilled and hot water to a building on a campus. What equipment must be commissioned to meet the requirements of Energy and Atmosphere Credit, Existing Building Commissioning - Analysis, Option 1. Existing Building Commissioning?A . Heat exchangersB . Central plant chillersC . Primary chilled water...
If the performance period calendar year is 2022, which of the following is an acceptable historical baseline?
A project is ineligible for an ENERGY STARĀ® Rating and will document Energy and Atmosphere Prerequisite, Minimum Energy Performance by benchmarking against historical data. If the performance period calendar year is 2022, which of the following is an acceptable historical baseline?A . Average of calendar years 2020 and 2021B ....
What is the maximum number of points a project could achieve using innovation credits for the Innovation Credit, Innovation?
What is the maximum number of points a project could achieve using innovation credits for the Innovation Credit, Innovation?A . One pointB . Two pointsC . Three pointsD . Four pointsView AnswerAnswer: D Explanation: According to the LEED AP Operations + Maintenance (LEED AP O+M) V4.1 guide, a project can...
Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of the following statements is correct when considering baseline water usage in relation to water use?
Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of the following statements is correct when considering baseline water usage in relation to water use?A . For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 120% of...