Which of the following is required documentation?
The project team is attempting to achieve Option 1. Lighting Controls in Indoor Environmental Quality Credit, Interior Lighting. Which of the following is required documentation?A . Table of lighting controls installedB . Manufacturers' data for occupancy sensorsC . The total area of the building square footageD . A photometric chart...
Which rating system would be the most appropriate one to use?
A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project's gross floor will be completed by the time of occupancy. LEED certification is being sought. Which rating system would be the most appropriate one to use?A . LEED Interior...
The measures called out on the following site plan may contribute to the achievement of which LEED credits? (Click on Exhibit)
The measures called out on the following site plan may contribute to the achievement of which LEED credits? (Click on Exhibit) Exhibit A . Sustainable Sites Credit, Rainwater Management; Sustainable Sites Credit, Light Pollution ReductionB . Sustainable Sites Credit, Rainwater Management; Sustainable Sites Credit, Heat Island ReductionC . Sustainable Sites...
What requirement must be met when creating a demand response program that satisfies Energy and Atmosphere Credit, Demand Response?
What requirement must be met when creating a demand response program that satisfies Energy and Atmosphere Credit, Demand Response?A . Demonstrate a load shift reduction of 5% in the buildingB . Permanently reduce the energy consumption in the building by 5%C . Have the building management sign a two-year demand...
Which of the following is an environmentally friendly technology for controlling erosion?
Which of the following is an environmentally friendly technology for controlling erosion?A . MulchingB . Laying asphaltC . Laying tarpaulin materialD . Spraying water to contain dustView AnswerAnswer: A Explanation: The correct answer is A because mulching is an environmentally friendly technology for controlling erosion, as stated in the web...
A tenant is moving into a new space in an existing building. They will fit out this new space and are considering LEED Certification. The tenant is projecting that 80% of the space will be used as office space. They will also have 10% of the space serving as a data center supporting the office. The remaining 10% will be used as a store showcasing and selling their consumer products for direct purchase to the general public. According to the Rating System Selection Guidance, which rating system would be most applicable for this project?
A tenant is moving into a new space in an existing building. They will fit out this new space and are considering LEED Certification. The tenant is projecting that 80% of the space will be used as office space. They will also have 10% of the space serving as a...
Lighting Control in Indoor Environmental Quality Credit, Interior Lighting?
What percentage of individual occupant spaces must have individual lighting controls in projects seeking Option 1. Lighting Control in Indoor Environmental Quality Credit, Interior Lighting?A . 40%B . 50%C . 60%D . 70%View AnswerAnswer: D Explanation: For projects seeking to comply with Option 1, Lighting Control of the Indoor Environmental...
Which of the following should be used to normalize the building's energy use?
A manufacturing plant is increasing units produced and the number of employees annually. The building is documenting compliance with Energy and Atmosphere Prerequisite, Minimum Energy Performance, Case 2, Option 1. Path 2 Benchmark Against Typical Buildings Using Comparables. Which of the following should be used to normalize the building's energy...
How long should a commercial kitchen prep sink be metered to establish a baseline when pursuing the Water Efficiency Prerequisite, Indoor Water Use Reduction, Option 2?
How long should a commercial kitchen prep sink be metered to establish a baseline when pursuing the Water Efficiency Prerequisite, Indoor Water Use Reduction, Option 2?A . Six monthsB . 12 monthsC . 18 monthsD . This type of fixture should not be meteredView AnswerAnswer: B Explanation: For establishing a...
Landscape irrigation practices consume large quantities of potable water. By evaluating the project's outdoor water budget and irrigation water demand early in the Establishment Period in Water Efficiency Credit, Outdoor Water Use Reduction project teams will be able to
Landscape irrigation practices consume large quantities of potable water. By evaluating the project's outdoor water budget and irrigation water demand early in the Establishment Period in Water Efficiency Credit, Outdoor Water Use Reduction project teams will be able toA . earn Water Efficiency Credit, Water MeteringB . earn Sustainable Sites...