What action must the project take to meet the Option 2 requirements?
A LEED Building Design and Construction: Schools project pursuing Location and Transportation Credit, Green Vehicles elects to follow Option 2. Green Buses or School-Owned Vehicles. What action must the project take to meet the Option 2 requirements?A . Install a preferred drop-off lane for buses meeting the emission requirementsB ....
Which of the following will result in a higher demand for potable water use in irrigation?
Which of the following will result in a higher demand for potable water use in irrigation?A . Sparsely planted areaB . Drip irrigation systemC . High evapotranspiration rateD . Rainwater harvesting systemView AnswerAnswer: C Explanation: The answer is C. A high evapotranspiration rate will result in a higher demand for...
Which of the following buildings meets the Minimum Program Requirements for LEED certification?
Which of the following buildings meets the Minimum Program Requirements for LEED certification?A . A 1,500 ft2 (139 m2) Tourism Center located on a previously undeveloped one-acre siteB . A 20,000 ft2 (1 859 m2) Transit Parking Garage located on a previously developed five-acre siteC . A 2,500 ft2 (232...
What supporting material is required for all LEED Building Design and Construction projects in order to document Location and Transportation Credit, Bicycle Facilities for the bicycle network?
What supporting material is required for all LEED Building Design and Construction projects in order to document Location and Transportation Credit, Bicycle Facilities for the bicycle network?A . Photographs of bicycle network signage and directional signpostsB . Photographs of the installed bicycle storage and shower facilitiesC . Vicinity map showing...
Air Quality Strategies, what is the minimum Design Zone Outdoor Airflow?
The Required Breathing Zone Outdoor Airflow Vbz for a new banking facility is 0.120 CFM/ft2 (0.6 L/s/m2). If the team decides to attempt Increased Ventilation under Option 2 in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, what is the minimum Design Zone Outdoor Airflow?A . 0.144 CFM/ft2...
Qualifying spaces for the Sustainable Sites Credit. Places of Respite must tgj
Qualifying spaces for the Sustainable Sites Credit. Places of Respite must tgjA . be located outdoors near a water featureB . be located at least 20 ft. (6 m) from a smoking areaC . have provisions for direct medical care to be delivered in the areaD . have options for...
When the project occupancy is not known, which method is recommended?
When the project occupancy is not known, which method is recommended?A . Default occupant density from ASHRAE 62.1-2010, Table 6-1B . Default occupant density from ASHRAE 90.1-2010, Table G3.1.1AC . Weekly average taken into account all the occupants in a typical 24-hour day of operationD . Occupancy measured for eight...
The Solar Reflectance Index (SRI) includes the measure of a material's
The Solar Reflectance Index (SRI) includes the measure of a material'sA . color (shade of gray)B . ability to reflect solar radiationC . ability to absorb solar radiationD . ability to reflect thermal radiationView AnswerAnswer: B Explanation: The Solar Reflectance Index (SRI) is a measure of the roof’s ability to...
What type of project would benefit from showing compliance with Energy and Atmosphere Prerequisite, MinimumEnergy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?
What type of project would benefit from showing compliance with Energy and Atmosphere Prerequisite, MinimumEnergy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?A . One in which the budget and timeline would benefit from simplified decision making and analysis during the project designB . One in which...
For Energy and Atmosphere Credit, Advanced Energy Metering, what is the minimum amount of time that the metering system should store data?
For Energy and Atmosphere Credit, Advanced Energy Metering, what is the minimum amount of time that the metering system should store data?A . 6 monthsB . 12 monthsC . 24 monthsD . 36 monthsView AnswerAnswer: D Explanation: For Energy and Atmosphere Credit, Advanced Energy Metering, the minimum amount of...