In the calculations for Water Efficiency Credit, Outdoor Water Use Reduction, food gardens
In the calculations for Water Efficiency Credit, Outdoor Water Use Reduction, food gardensA . must be calculated using at least 20% from an alternative water sourceB . must be calculated using 100% potable waterC . may be included or excluded from the calculationsD . may be calculated using a standard...
Several Materials and Resources credits give a bonus location valuation factor, which allows products extracted, manufactured and produced within 100 mi. (161 km) of the project to take double valuation in credit calculations. The intent of this bonus is
Several Materials and Resources credits give a bonus location valuation factor, which allows products extracted, manufactured and produced within 100 mi. (161 km) of the project to take double valuation in credit calculations. The intent of this bonus isA . to shorten construction duration by reducing shipping timesB . to...
Which alternative analyses should the team run to check different impact measurements?
A project team compares a life-cycle assessment (LCA) model to a baseline design to determine the reductions in six impact categories. One impact category exceeds the baseline by 7%. Which alternative analyses should the team run to check different impact measurements?A . Change the orientation of the design case buildingB...
How can this project comply with Sustainable Sites Credit, Heat Island Reduction?
A project in a cold climate does not want a highly reflective roof because they want the heat absorption. How can this project comply with Sustainable Sites Credit, Heat Island Reduction?A . The credit is not feasible for this projectB . The credit may be achieved by using nonroof measures...
When working on a renovation project, asbestos containing materials have been found on the perimeter walls. When calculating the percentage of building being reused under the Materials and Resources Credit, Building Life-Cycle Impact Reduction, the materials remediated will be
When working on a renovation project, asbestos containing materials have been found on the perimeter walls. When calculating the percentage of building being reused under the Materials and Resources Credit, Building Life-Cycle Impact Reduction, the materials remediated will beA . included in the calculationB . excluded from the calculationC ....
Which of the following should remain the same for both the baseline building and the proposed building?
A project team is using the whole building simulation model to quantify the percentage of energy savings for the project. Which of the following should remain the same for both the baseline building and the proposed building?A . Building operating schedule and occupancy hoursB . Building operating schedule and total...
For major renovation and new construction projects, the required energy and water-related system analyses should be the same except for
For major renovation and new construction projects, the required energy and water-related system analyses should be the same except forA . site conditionsB . massing and orientationC . plug and process load needsD . building envelope performanceView AnswerAnswer: C Explanation: For major renovation and new construction projects, the required energy...
Which of the following credits would be desirable considering the location of the project?
A luxury hotel project is in the design phase and is located on a scenic waterfront. It is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be desirable...
A Healthcare Project is constructing a new building adjacent to an existing LEED Certified hospital facility. The new building's location is on the same hospital campus as the certified facility. The entire hospital campus was analyzed with an Environmental Site Assessment (ESA) as part of the certified facility's project scope.
A Healthcare Project is constructing a new building adjacent to an existing LEED Certified hospital facility. The new building's location is on the same hospital campus as the certified facility. The entire hospital campus was analyzed with an Environmental Site Assessment (ESA) as part of the certified facility's project scope....
A comprehensive rainwater management plan may include design elements such as
A comprehensive rainwater management plan may include design elements such asA . artificial turf, bioretention pond, cisterns and hay balesB . cisterns, porous pavement, swales and vegetated roofsC . soil compaction, swales, vegetated roofs and xeriscapingD . bioretention pond, cisterns, porous pavement and stabilized construction entranceView AnswerAnswer: B Explanation: These...