Which principal areas must the LEED AP focus on to attain the Integrative Process Credit, Integrative Process?
Which principal areas must the LEED AP focus on to attain the Integrative Process Credit, Integrative Process?A . Materials and resourcesB . Location and site selectionC . Regional priority and innovationD . Energy and water related systemsView AnswerAnswer: D Explanation: The Integrative Process credit, Integrative Process, requires the project team...
During preliminary energy analysis, what energy reduction strategies can best help in reducing the energy load in the new building construction project?
During preliminary energy analysis, what energy reduction strategies can best help in reducing the energy load in the new building construction project?A . Green roofB . Site conditionsC . Massing and orientationD . Programmatic and operational parametersView AnswerAnswer: C Explanation: During preliminary energy analysis, massing and orientation are energy reduction...
Assuming no other portions of the fixture meet sustainability criteria, what would the contributing value of the fixture be?
A decorative overhead light fixture is specified for a project that costs $1,500 USD and uses recycled water bottles as part of the diffuser shade. The shades are 10% of the overall weight of the fixture and are 50% post-consumer recycled content. Assuming no other portions of the fixture meet...
What is the maximum number of points a project pursuing LEED for New Construction can achieve under Location and Transportation Credit, Access to Quality Transit?
What is the maximum number of points a project pursuing LEED for New Construction can achieve under Location and Transportation Credit, Access to Quality Transit?A . Two pointsB . Three pointsC . Four pointsD . Five pointsView AnswerAnswer: C Explanation: According to the LEED v4: Building Design + Construction Guide,...
For Location and Transportation Credit, Access to Quality Transit, a project team preparing timetables and service-level documentation must ensure the materials include
For Location and Transportation Credit, Access to Quality Transit, a project team preparing timetables and service-level documentation must ensure the materials includeA . verification that a weighted daily average has been used for each qualifying routeB . confirmation that functional entries of the project are within 3/4 mi. (1.20 km)...
Which rating system is applicable for the building?
An existing vacant office building will be completely renovated and new mechanical, electrical and plumbing systems will be installed. 20% of the building's gross floor area will be complete at the time of certification. There will be a data center and some retail stores on the ground floor of the...
In order to meet the minimum qualifications for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification a Commissioning (Cx) agent must have completed the commissioning process activities for a minimum of how many similar projects?
In order to meet the minimum qualifications for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification a Commissioning (Cx) agent must have completed the commissioning process activities for a minimum of how many similar projects?A . ZeroB . OneC . TwoD . ThreeView AnswerAnswer: C Explanation: The commissioning (Cx) agent...
U.S. Green Building Council (USGBC)'s vision for using LEED internationally includes
U.S. Green Building Council (USGBC)'s vision for using LEED internationally includesA . allowing more stringent credit requirements for countries outside of the U.S. so that all projects can achieve LEEDB . creating multiple LEED rating systems for different countriesC . modifying U.S. reference standards, such as ASHRAE 90.1, to be...
Which landscaping strategy is important to employ in order to reduce water demand?
A building owner in an arid climate is trying to design an outdoor lunch area for the tenants. Which landscaping strategy is important to employ in order to reduce water demand?A . Large maple trees for shadingB . Xeriscaping landscape bedsC . Turf grass area for picnic benchesD . Tropical...
Which of the following project types is required to consider the perimeter floor area instead of the regularly occupied floor area under the Indoor Environmental Quality Credit, Daylight calculations?
Which of the following project types is required to consider the perimeter floor area instead of the regularly occupied floor area under the Indoor Environmental Quality Credit, Daylight calculations?A . RetailB . SchoolsC . HealthcareD . Core and ShellView AnswerAnswer: C Explanation: Healthcare projects are required to consider the perimeter...