What is the minimum solution that meets the customer requirements?
An architect proposes four 7210 Mobility Controllers (MCs) to support about 1,500 client APs. The customer environment will have a maximum of about 20,000 wireless clients. The customer wants hardware MMs with an active and standby deployment. What is the minimum solution that meets the customer requirements?A . two MM-HW-10K...
Which benefit of this feature should the architect explain?
A customer has very high availability requirements for wireless services. The architect plans to implement clustering on several Aruba Mobility Controllers (MCs). Which benefit of this feature should the architect explain?A . Clustering provides wireless client load balancing and seamless failover for client sessions.B . Clustering provides high stability because...
What should be the VLAN assignment for Link 1, indicated in the exhibit?
Refer to the exhibit. The customer needs to expand its wired and wireless network to a new building, Building 2, which is near the existing building, Building 1. The exhibit shows the logical plan that the architect has created so far. The aggregation layer switches in the new building should...
What helps to support high availability specifically for the SDN services?
An architect plant to purpose an Aruba wireless solution with several Mobility Controllers (MCs) and a Mobility Master (MM) architecture. Wireless users run Skype for Business, a Unified Communications (UC) solution. The architect plans to use the Aruba SDN capabilities to integrate with the UC solution. What helps to support...
Refer to the provided scenario. Based on the plan for wired authentication, what is a correct plan for wired user VLANs?
Aruba AirWare The architect also needs to propose a security plan for the solution. The customer has 900 employees and up to 30 guests a day. The customer wants to protect the internal perimeter of the network with authentication and simple access controls. The customer is most concerned about wireless...
What should be the VLAN assignment for Link 1, indicated in the exhibit?
Refer to the exhibit. The customer needs to expand its wired and wireless network to a new building, Building 2, which is near the existing building, Building 1. The exhibit shows the logical plan that the architect has created so far. The aggregation layer switches in the new building should...
About how many AMs should the architect recommend per floor?
A financial institution has an Aruba wireless system. Each floor is 19 meters by 23 meters (200 feet by 250 feet) and has 20 APs. The organization now requires dedicated Air Monitors (AMs). About how many AMs should the architect recommend per floor?A . about 1 or 2 per floorB...
What are the minimal links to meet these requirements?
An architect needs to plan the bandwidth for two Aruba 7240 Mobility Controllers (MCs) which will connect to the network core. The customer indicates that four 10 GbE links between the network core and the data center will be adequate. The customer expects almost all traffic in the network will...
Which component should the architect include to provide these services?
A customer needs a networking solution that supports their Microsoft Skype for Business Unified Communications (UC) solution. The architect plans to use multiple Aruba APs, switches, and controllers. The customer wants real time statistics and assessment of call quality. Which component should the architect include to provide these services?A ....
Which changes should the architect make to the recommended solution based on this characteristic?
An architect needs to help a customer design a management and monitoring solution for an Aruba network in an airport. The solution consists of an Aruba Mobility Master (MM), Aruba 7210 MCs, Aruba AP-335s, and Aruba 5496R switches. The architect plans to recommend Aruba AirWare. The airport has a high-client...