The active-active status will be interrupted if a quorum server is faulty.
The active-active status will be interrupted if a quorum server is faulty.A . TrueB . FalseView AnswerAnswer: B
When performing a controller fault test on the Dorado V6 mission-critical product models, ensure that each controller has a link to the host.
When performing a controller fault test on the Dorado V6 mission-critical product models, ensure that each controller has a link to the host.A . TrueB . FalseView AnswerAnswer: B Explanation: For Host, only one session For controllers, have their own sessions to host
OceanStor 100D uses NVDIMMs as cache, which can prevent data loss during power failure.
OceanStor 100D uses NVDIMMs as cache, which can prevent data loss during power failure.A . YesB . NoView AnswerAnswer: A
The OceanStor Os’s data plane and management plane are isolated from each other. Faults on either plane will not affect the other plane
The OceanStor Os’s data plane and management plane are isolated from each other. Faults on either plane will not affect the other planeA . TrueB . FalseView AnswerAnswer: A
In OceanStor Dorado V6, one LUN is enough for testing close-to-maximum performance.
In OceanStor Dorado V6, one LUN is enough for testing close-to-maximum performance.A . TrueB . FalseView AnswerAnswer: B
Controllers must be restarted during software NDU upgrade of Dorado V6.
Controllers must be restarted during software NDU upgrade of Dorado V6.A . TrueB . FalseView AnswerAnswer: B
OceanStor 100D provides inline deduplication.
OceanStor 100D provides inline deduplication.A . TrueB . FalseView AnswerAnswer: A
Two quorum devices are deployed at the third-place site.
Two quorum devices are deployed at the third-place site. Both quorum devices can be used for arbitration at the same time.A . TrueB . FalseView AnswerAnswer: B
Huawei is the only storage vendor that has passed the 9-intensity earthquake resistance certification in China.
Huawei is the only storage vendor that has passed the 9-intensity earthquake resistance certification in China.A . TrueB . FalseView AnswerAnswer: A
In the test case of front-end interface module redundancy, you must first power off the controller and then the front-end interface module.
In the test case of front-end interface module redundancy, you must first power off the controller and then the front-end interface module.A . TrueB . FalseView AnswerAnswer: B