In the OceanStor V3 storage system, which of the following is not part of the compatibility evaluation when doing live-active design?
In the OceanStor V3 storage system, which of the following is not part of the compatibility evaluation when doing live-active design?A . Confirm the operating system type and version of the disaster recovery protection objectB . Confirm the database type and version of the disaster recovery protection objectC . Confirm...
Engineer install OceanStro 9000 equipment to a customer unit (total 5 OceanStor 9000 C Node, front and rear ends are 10GE TOE networking, on-site install TOE card), the device has completed the putaway, the next will connect the signal lines, power lines, and software test due to the tight schedule, hardware installation process has the following phenomena, do you think which of the following description for these phenomena is correct? (Multiple choice)
Engineer install OceanStro 9000 equipment to a customer unit (total 5 OceanStor 9000 C Node, front and rear ends are 10GE TOE networking, on-site install TOE card), the device has completed the putaway, the next will connect the signal lines, power lines, and software test due to the tight schedule,...
The following description of high performance technology in HyperMetro, which is correct? (Multiple Choice)
The following description of high performance technology in HyperMetro, which is correct? (Multiple Choice)A . Reduce copy is quick recognition to the data copy source end through the hardware chip and find out the zero data; in the process of copy, all zero data will be specially identified, only a...
In the HyperMetro Active-Active Data Center solution, the Data Center A array receives write I/O requests, for the image processing process, which is correct?
In the HyperMetro Active-Active Data Center solution, the Data Center A array receives write I/O requests, for the image processing process, which is correct?A . Apply for write permission -> Perform double write -> Record write log -> Double write result processing -> Response hostB . Apply for write permission...
A customer purchased 12 C72 nodes and 22 P25E nodes. When implement the implementation plan, the following arguments which are wrong? (Multiple choice)
A customer purchased 12 C72 nodes and 22 P25E nodes. When implement the implementation plan, the following arguments which are wrong? (Multiple choice)A . 12 C72 nodes are classified as a node poolB . The front-end network can all adopt 10GE networkC . InfoTier can be used to store data...
At this critical business need for emergency Foreign companies to provide services, which command should the administrator need to execution?
Users use Storage Foundation HA cluster software and two Huawei blade servers to build a high availability environment, an important business for the enterprise to provide 7 * 24 hours service. One day because of power failure outage causes one of them cannot be normal boot server failure, at the...
Which of the following VMware virtual machine scene can be adopted to backup VADP?
Which of the following VMware virtual machine scene can be adopted to backup VADP?A . storage directly connected to the virtual machine, including RDMs, direct iSCSI or NFSB . virtual machine contains a large databaseC . Virtual deployed AIX operating systemD . virtual machine contains a non-Microsoft family applicationView AnswerAnswer:...
Which of the following description about naming space is correct?
Huawei OceanStor 9000 provide a single file system, and name the space management through a unified file system. Which of the following description about naming space is correct? (Multiple choice)A . namespace is automatically created when you start Huawei OceanStor 9000. Its name is consistent with the system naming.B ....
About the data switch of OceanStor 18000, the incorrect description is:
About the data switch of OceanStor 18000, the incorrect description is:A . The PCI-E cable between the data switch and the engine connect one-to-one correspondence strictly, can’t be mixed insertionB . Engineers only need to connect the data switch and the engine throguh the PCI-E business portC . The data...
In the process of engineers carry out storage array controller replacement operations, which of the following description is wrong?
In the process of engineers carry out storage array controller replacement operations, which of the following description is wrong?A . Prior to plug the controller, make sure that the business has stopped or has switched to the peer controller.B . before change the business to the opposite end controller, be...