Why does the ping fail between the two switches?
Refer to the exhibits. A networking engineer is unable to ping from VLAN 30 across two S-Series switches. Port 13 on switch Dell1 and Port 43 on switch Dell2 both have a link status of up. Why does the ping fail between the two switches?A . Dell1 switch VLAN 30...
Given the labeled diagram shown, what Spanning-Tree Priority is Switch B advertising for VLAN 20?
Refer to the exhibit. The deployment engineer needs to use rapid PVST+ so that some traffic is forwarding on all inter-switch links on these three N-Series Switches. To do so, each switch has been set to the lowest spanning-tree priority value for one of the VLANs. Given the labeled diagram...
What is the most effective choice?
A network engineer needs to summarize the IP range of addresses from 172.16.32.0 to 172.16.35.255. What is the most effective choice?A . 172.16.32.0/23B . 172.16.32.0/21C . 172.16.32.0/22D . 172.16.32.0/20View AnswerAnswer: C
Which three components can be used to deploy 10GbE N-Series switches in a user-port stack configuration? (Choose three.)
Which three components can be used to deploy 10GbE N-Series switches in a user-port stack configuration? (Choose three.)A . SAS CablesB . Standard Ethernet CablesC . Dedicated stacking modulesD . TwinAx CablesE . Optical TransceiversView AnswerAnswer: ACE
Which configuration should a network engineer set on the Gi 0/47 interface to provide power to the phone?
Refer to the exhibit. A customer has a C-Series chassis using a 48-port PoE+ line card. A workstation connected to Gi 0/47 passes traffic as expected. When the customer connects a PoE phone to the interface, the phone does NOT power up. Which configuration should a network engineer set on...
What correctly defines the state of the Root Bridge for VLAN 2 and VLAN 3?
Refer to the exhibit. On switch S4820-1, commands are entered. The associated output is as shown. What correctly defines the state of the Root Bridge for VLAN 2 and VLAN 3?A . VLAN 2 Root Bridge C S4820-2 VLAN 3 Root Bridge C S4820-2B . VLAN 2 Root Bridge C...
Which two issues occur when the network engineer tries to stack all four switches and implement OSPF?
A network deployment engineer needs to deploy four Dell Networking N1500 series switches. All switches are to be stacked together using 10Gbe ports on each switch and implement OSPF per the deployment plan. The customer has been shipped only the four switches with SAS stacking cables. No other equipment has...
Which command MUST have been entered previously on switch S4820-1?
Refer to the exhibit. On switch S4820-2, commands are entered. The associated output is a follows: Which command MUST have been entered previously on switch S4820-1?A . S4820-1 (conf-pvst)#vlan 2 bridge-priority 4096B . S4820-2 (conf-pvst)#vlan 2 bridge-priority 20480C . S4820-1 (conf-pvst)#vlan 3 bridge-priority 20480D . S4820-1 (conf-pvst)#vlan 3 bridge-priority 4096View...
Which two options allow the switch to boot successfully using the newer firmware?
Refer to the exhibits. A customer upgrades its C-Series switch and is experiencing a constant boot loop. Which two options allow the switch to boot successfully using the newer firmware? (Choose two.)A . B . C . D . E . View AnswerAnswer: AE
What needs to be provided to enable the network engineer to complete this task?
A network engineer needs to install five Dell N-Series switches in a stack for a company that is moving to a new building. The following items are received: - 5x Dell N4032 switches - 5x Power cords - 5x QSFP+ module card - 120 CAT6 patch cords - 1x UPS...