Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?
Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?A . Create object selection variant for transportation lane-related alerts. B. Create object selection variant for product-related alerts. C. Assign the overall profile to the authorization profile. D. Assign the alert profile to the...
What determines whether the storage location can be derived from the production version?
An issue storage location was NOT found through the work center, bill of material (BOM) item, or material master . What determines whether the storage location can be derived from the production version?A . MRP group B. Plants parameters C. MRP controller D. MRP profileView AnswerAnswer: A
What is the difference between co-products and by-products?
What is the difference between co-products and by-products?A . Only co-products appear in the process or production order settlement rule. B. Only co-products can be manufactured in isolation from the main product. C. Only co-products are identified by a special item category in the bill of material (BOM). D. Only...
How can you limit the validity of a bill of material (BOM)?
How can you limit the validity of a bill of material (BOM)?A . By plant B. By material type C. By industry D. By periodView AnswerAnswer: A,D
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?A . Material Requirements Planning (MRP) B. Capacity Requirements Planning (CRP) C. Supply Network Planning (SNP) D. Demand Planning (DP)View AnswerAnswer: A
Which SAP application can be used for forcasting in Supply Chain Planning?
Which SAP application can be used for forcasting in Supply Chain Planning?A . Material Requirements Planning (MRP) B. Supply Chain Management(SCM) C. Integrated Business Planning (IBP) D. Capacity Requirements Planning (CRP)View AnswerAnswer: B,C
How does the insertion take place?
You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched . How does the insertion take place?A . The previously dispatched operation stays as is; the new operation is...
Which planning procedure do you recommend?
You want to reduce planning efforts for B/C materials . Which planning procedure do you recommend?A . Material requirements planning B. Manual planning without check C. Forecast planning D. Consumption-based planningView AnswerAnswer: D
Where do you maintain the work center that represents the production line for repetitive manufacturing?
Where do you maintain the work center that represents the production line for repetitive manufacturing?A . Production version B. Routing C. Repetitive manufacturing profile D. Production cost collectorView AnswerAnswer: A,B
Which of the following is valid sequence of the main activities in production order processing?
Which of the following is valid sequence of the main activities in production order processing?A . Creation, availability check, release, material widrawal, confirmation B. Creation, release, printing, goods issue, confirmation, goods receipt C. Creation, printing, release, goods issue, confirmation, goods receipt D. Creation, release, settlement, goods issue, confirmation, goods receiptView...