______________to be established to judge acceptability of risk couldhe an objective of the rbi assessment if such criteria do not exist already within the user's company.
______________to be established to judge acceptability of risk couldhe an objective of the rbi assessment if such criteria do not exist already within the user's company.A . Risk criteriaB . Risk planC . Risk analysisView AnswerAnswer: A
The primary work products of the rbi assessment and management approach and implementation of rbi provides
The primary work products of the rbi assessment and management approach and implementation of rbi providesA . Overall reduction of risk and acceptance of current riskB . Overall increase of risk and acceptance of riskC . Overall reduction of risk and negligence of current riskD . Overall increase of risk...
Who can provide useful input (such as the spectrum of process conditions, injection points etc.) To aid materials specialists in the identification of deterioration mechanisms and rates
Who can provide useful input (such as the spectrum of process conditions, injection points etc.) To aid materials specialists in the identification of deterioration mechanisms and ratesA . Process specialistsB . Plant operation specialistsC . Asset integrity expertsD . Inspection engineersView AnswerAnswer: A
Following are some of the recognized risks which cannot be managed by inspection alone except one
Following are some of the recognized risks which cannot be managed by inspection alone except oneA . Equipment nearing retirementB . Failure mechanisms (such as brittle fracture, fatigue) where avoidance of failure primarily depends on operating within a defined pressure/temperature envelopeC . Consequence-dominated risksD . The suitability and current condition...
The models are evaluated_____________to provide both qualitative and quantitative insights about the level of risk and to identify the design, site, or operational characteristics that are the most important to risk
The models are evaluated_____________to provide both qualitative and quantitative insights about the level of risk and to identify the design, site, or operational characteristics that are the most important to riskA . ProbabilisticallyB . StatisticallyC . LinearlyD . LogicallyView AnswerAnswer: D
The primary audience for rp 580 is
The primary audience for rp 580 isA . Inspection and materials engineering personnelB . Maintenance personnelC . Only inspection personnelD . Only materials engineering personnelView AnswerAnswer: C
If the probability and consequence combination (risk) is high enough to be unacceptable, then
If the probability and consequence combination (risk) is high enough to be unacceptable, thenA . A mitigation action to predict or prevent the eventis recommended.B . A mitigation action to predict or prevent the event isnot recommendedC . Warrant to analyze risks involvedView AnswerAnswer: A
A process to assess risks, to determine if risk reduction is required and to develop a plan to maintain risks at an acceptable level
A process to assess risks, to determine if risk reduction is required and to develop a plan to maintain risks at an acceptable levelA . Risk managementB . Risk mitigationC . Risk controlView AnswerAnswer: A
The amount and type of codes and standards used by a facility can have
The amount and type of codes and standards used by a facility can haveA . Significant impact on rbi resultsB . No impact on rbi resultsC . Less significant impact on rbi resultsView AnswerAnswer: A
Thing or activity with a potential for con- sequence
Thing or activity with a potential for con- sequenceA . SourceB . HazardC . ToxicView AnswerAnswer: A