As part of a Visual Factory plan _____________ are created and utilized to identify areas in need of cleaning and organization.
As part of a Visual Factory plan _____________ are created and utilized to identify areas in need of cleaning and organization.A . Flashing lightsB . Soft hornsC . Kanban cardsD . Operator announcement programsView AnswerAnswer: C
The DMAIC approach to problem solving stands for Define, __________, Analyze, Improve and Control.
The DMAIC approach to problem solving stands for Define, __________, Analyze, Improve and Control.A . ManageB . MeasureC . MemorizeD . ManipulateView AnswerAnswer: B
The Control Plan is created following the finalization of the Measure Phase and can be closed when?
The Control Plan is created following the finalization of the Measure Phase and can be closed when?A . After the project costs have been recoupedB . When the Champion says soC . Never, a Control Plan must stay in placeD . At the fiscal yearend of the businessView AnswerAnswer: C
A 5 Why Analysis is used to help identify possible defect causes when which one of the below listed tools is created?
A 5 Why Analysis is used to help identify possible defect causes when which one of the below listed tools is created?A . Fishbone DiagramB . SIPOCC . X-Y MatrixD . Pareto ChartView AnswerAnswer: A
Systems and structures are the basis for allowing people to change their behaviors permanently and are accomplished through which of the following?
Systems and structures are the basis for allowing people to change their behaviors permanently and are accomplished through which of the following?A . Documented performance objectivesB . Defined proceduresC . Accurate job descriptionsD . Incentive compensationE . All of these answers are correctView AnswerAnswer: E
In an organization is the sum total of all the processes which occur in the business to take inputs and turn them into customer desired outputs is called the Value Chain.
In an organization is the sum total of all the processes which occur in the business to take inputs and turn them into customer desired outputs is called the Value Chain.A . TrueB . FalseView AnswerAnswer: A
Training cost $2,500 and a project required an initial investment of $23,500. If the project yields monthly savings of $2,500 beginning after 4 months, what is the payback period in months (before money costs and taxes)?
Training cost $2,500 and a project required an initial investment of $23,500. If the project yields monthly savings of $2,500 beginning after 4 months, what is the payback period in months (before money costs and taxes)?A . 7.2B . 10.4C . 14.4D . 28.8View AnswerAnswer: C
The ROI for a project is a measurement metric that stands for _____________________ and is one of the methods used to measure the success of a Lean Six Sigma project.
The ROI for a project is a measurement metric that stands for _____________________ and is one of the methods used to measure the success of a Lean Six Sigma project.A . Return on InvestmentB . Recognition of InnovationC . Recovery of InvestmentD . Return on InventoryView AnswerAnswer: A
The purpose of a Process Map is to identify the complexity of the process and to assist in identifying ______________ in the process.
The purpose of a Process Map is to identify the complexity of the process and to assist in identifying ______________ in the process.A . Critical stepsB . Line operatorsC . Test stationsD . DefectsView AnswerAnswer: A
Which of the following is a method of expressing the concept that the outputs of a process are a function of all the inputs to the process?
Which of the following is a method of expressing the concept that the outputs of a process are a function of all the inputs to the process?A . Y = f(Xn)B . RTY > 90%C . Yield = EffortD . Flow = DemandView AnswerAnswer: A