Fractional Factorial designs for an experimental approach are used when ____________ about the multiple metric interaction in a process.

Fractional Factorial designs for an experimental approach are used when ____________ about the multiple metric interaction in a process.A . Much is knownB . Little is knownC . We don’t careD . Data existsView AnswerAnswer: B

August 1, 2020 No Comments READ MORE +

When a Belt applies the practice of Poka-Yoke to a project challenge she is attempting to make certain the activity is _______________ .

When a Belt applies the practice of Poka-Yoke to a project challenge she is attempting to make certain the activity is _______________ .A . Well documentedB . Removed from the lineC . Mistake proofedD . Highly visibleView AnswerAnswer: C

July 31, 2020 No Comments READ MORE +

According to the definition of Rolled Throughput Yield which of the following items best describe the purpose of RTY?

According to the definition of Rolled Throughput Yield which of the following items best describe the purpose of RTY?A . A function of Y=f(x)B . Determines incremental GrowthC . Isolates the increase throughputD . Accounts for rejects and reworksView AnswerAnswer: D

July 31, 2020 No Comments READ MORE +

This is the result of which of these?

The actual experimental response data varied somewhat from what a Belt had predicted them to be. This is the result of which of these?A . Inefficiency of estimatesB . ResidualsC . Confounded dataD . Gap AnalysisView AnswerAnswer: B

July 31, 2020 No Comments READ MORE +

If the data displayed in a Histogram displays two peaks the distribution would likely be _____________.

If the data displayed in a Histogram displays two peaks the distribution would likely be _____________.A . TransformedB . Multi-skewedC . Bi-attributeD . BimodalView AnswerAnswer: D

July 31, 2020 No Comments READ MORE +

A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?

A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?A . Never, a Control Plan is a living documentB . As soon as the Champion signs offC . Within 30 days of the LSS project review...

July 31, 2020 No Comments READ MORE +

As part of a Visual Factory plan __________ cards are created and utilized to identify areas in need of cleaning and organization.

As part of a Visual Factory plan __________ cards are created and utilized to identify areas in need of cleaning and organization.A . KanbanB . KaizenC . Poke-YokeD . WhoSaiView AnswerAnswer: A

July 30, 2020 No Comments READ MORE +

When a Belt is analyzing sample data she should keep in mind that 95% of Normally Distributed data is within +/- 2 Standard Deviations from the Mean.

When a Belt is analyzing sample data she should keep in mind that 95% of Normally Distributed data is within +/- 2 Standard Deviations from the Mean.A . TrueB . FalseView AnswerAnswer: A

July 30, 2020 No Comments READ MORE +

A primary benefit of using a Multi-Vari Chart is it provides a visual presentation of two-way interactions.

A primary benefit of using a Multi-Vari Chart is it provides a visual presentation of two-way interactions.A . TrueB . FalseView AnswerAnswer: A

July 30, 2020 No Comments READ MORE +

The following Business Case is constructed properly. “During fiscal year 2008 the warranty returns for electric razor Model 312 were 1.3%. This represents a gap of 0.5% over target costing the company $18,500 per month.”

The following Business Case is constructed properly. “During fiscal year 2008 the warranty returns for electric razor Model 312 were 1.3%. This represents a gap of 0.5% over target costing the company $18,500 per month.”A . TrueB . FalseView AnswerAnswer: A

July 30, 2020 No Comments READ MORE +