Six Sigma LSSWB Lean Six Sigma White Belt Online Training
Six Sigma LSSWB Online Training
The questions for LSSWB were last updated at Feb 16,2025.
- Exam Code: LSSWB
- Exam Name: Lean Six Sigma White Belt
- Certification Provider: Six Sigma
- Latest update: Feb 16,2025
What does the Six Sigma mean?
- A . ultimately reduces process costs
- B . decreases customer satisfaction
- C . is a methodology for process improvement
- D . is a statistical concept that seeks to find variation in processes
- E . all of the above
What do Data driven processes mean?
- A . are heavily based on intuition
- B . rely heavily on the experience of the process owners
- C . are based on statistical data, measurement and metrics
- D . do NOT rely on mathematical models
Beta testing is the act of implementing a new idea, system or product on a large scale, controlled environment within the entire organization.
- A . True
- B . False
A process that performs at a 6 sigma level:
- A . is considered statistically ‘perfect’
- B . has 3.4 defects per million opportunities
- C . operates at a 99.99966% accuracy
- D . all of the above
The statistical difference between a process operating at a 5 sigma level and a process operating at a 6 sigma level is markedly different when it comes to the number of defects present.
- A . True
- B . False
A Six Sigma level is calculated by which of the following equations:
- A . (Opportunities – Defects)/Opportunities x 100
- B . (Opportunities + Defects)/Opportunities x 100
- C . (Defects – Opportunities)/Defects x 100
- D . (Defects + Opportunities)/Defects x 100
When prioritizing Six Sigma projects within an organization:
- A . The project with the statistically lowest sigma level should always be prioritized
- B . The project with the highest potential cost savings should always be prioritized.
- C . The project with the highest potential customer satisfaction increase should always be prioritized.
- D . All of the above should be considered and statistically researched before choosing the best option for the organization at hand.
What does the Value Stream mean?
- A . is the sequence of all items, events and people required to produce an end result.
- B . is used to identify areas of concern, waste and improvement.
- C . Neither A nor B
- D . Both A and B
An organization that fully adopts the Six Sigma methodology:
- A . completes a few Six Sigma Projects and reaps the financial benefits
- B . continuously measures and improves processes indefinitely
- C . improves upon a few processes then moves on
- D . identifies and prioritizes areas of opportunity once or twice a year
Which of the following is NOT an example of a common challenge of the Six Sigma Methodology within an organization?
- A . lack of support
- B . poor project execution
- C . excess resources
- D . lack of access to data