The Agile Team includes the Scrum Master and which other key role?
- A . Product Owner
- B . Release Train Engineer
- C . Project Manager
- D . Product Manager
What is the purpose of the Large Solution level in SAFe?
- A . To coordinate the work of multiple Agile Teams on the Agile Release Train (ART)
- B . To regulate large batch delivery across multiple ARTs at the Solution level
- C . To coordinate multiple Agile Release Trains that develop the same Solution
- D . To create large Portfolio-level Solutions that the ART can use to create organizational alignment
What is one problem with phase-gate Milestones?
- A . They assume a point Solution exists and can be built right the first time
- B . They force design decisions too late in the process
- C . They account for variability inherent in the process
- D . They require the Product Owner to act as gatekeeper or guardian of the process
What is one output from the problem-solving workshop?
- A . ROAMed risks
- B . All the potential Solutions the team could identify
- C . An assessment report
- D . Top improvement items for the next PI
How is average lead time measured in a Kanban system?
- A . By taking the average velocity over the last three iterations
- B . Measure the vertical distance between arrival and departure lines on a cumulative flow diagram
- C . Measure the horizontal distance between arrival and departure lines on a cumulative flow diagram
- D . Measure the lead time for at least three items and calculate the statistical mean of the items
What is the primary measurement during Inspect and Adapt?
- A . Program predictability measure
- B . Team NPS score
- C . Number of Features delivered
- D . Number of automated tests
A team integrates and tests the Stories on the last day of the Iteration. This has become a pattern for the last three Iterations.
Why is this considered an anti-pattern?
- A . Because the team is waterfalling the Iteration
- B . Because the team demonstrates the full Stories to the Product Owner during the Iteration review
- C . Because the team consistently meets their commitments, and the Product Owner accepts the Stories
- D . Because it is difficult to manage dependencies with other teams
What is a benefit of an Agile Release Train that has both cadence and synchronization?
- A . The Agile Release Train is able to control the injection on new work
- B . Dependencies are identified across the Agile Release Train
- C . Teams participate in the portfolio backlog refinement
- D . The entire system is iterating
A Scrum Master is asked to help an Agile Release Train that has struggled through multiple Pls. They just finished the second Iteration in the current PI and have nothing to show at the System Demo. The ART stakeholders are concerned.
What should be done?
- A . Stop working on any new functionality and fully integrate and test the system; adjust scope based on what is learned
- B . Have every team demonstrate their team increment to the stakeholders separately in the team branch
- C . Find a vendor that specializes in integrating system increments from multiple teams
- D . Re-architect the system so that there are no dependencies between the teams; integration is not required at this time
Which two statements are true about a Feature? (Choose two.)
- A . It is developed within a single Agile Team
- B . It is fully completed by a single Agile Release Train within one PI
- C . It is prioritized using weighted shortest job first
- D . It has one Capability as a parent