What is the principal advantage of using objective evaluation of working systems as milestones in the Scaled Agile Framework?
- A . Centralized decisions regarding design and requirements
- B . Increased system performance
- C . Significantly lower solution bug rate
- D . Risk mitigation
In the Kanban boards some steps have work in process (WIP) limits.
Why is this necessary?
- A . To enable multitasking
- B . To ensure large queues are not being built
- C . To help Continuous Deployment
- D . To keep timebox goals
Which statement is true about batch size?
- A . Large batch sizes limit the ability to preserve options
- B . When stories are broken into tasks it means there are small batch sizes
- C . Large batch sizes ensure time for built-in quality
- D . When there is flow it means there are small batch sizes
Which statement is true about batch size?
- A . When Stories are broken into tasks it means there are small batch sizes
- B . The handoff batch should be made as large as possible
- C . Large batch sizes ensure time for built-in quality
- D . Large batch sizes increase variability
If small batches go through the system faster with lower variability, then which two statements are true about batch size? (Choose two.)
- A . Good infrastructure enables large batches
- B . Proximity (co-location) enables small batch size
- C . Batch sizes cannot influence our behavior
- D . Severe project slippage is the most likely result of large batches
- E . Low utilization increases variability
You’re managing a team that has embodied SAFe. It takes about 5 days for each of your internal clients’ requests for a feature to be answered by the development lead and, on average, only about 2 days to implement a feature. The testing team also takes another day, but the handover from development to testing takes two days per feature request.
What’s the immediate SAFe tip you would implement to ensure that value is delivered sooner?
- A . Remove, or minimize, the implementation time.
- B . Remove the development lead and educate a self-organizing team.
- C . Have the developers carry out the testing of their own work and remove the testing team completely.
- D . Remove, or minimize, the request wait time and the testing handover time.
SAFe is a flow-based system.
Which is not a property of a flow system?
- A . Batch
- B . Queue
- C . Work in process (WIP)
- D . Retro
What should the team focus on to optimize flow?
- A . Cost
- B . Requests
- C . Delays
- D . Results
Optimizing flow means identifying what?
- A . Key performance indicators
- B . Delays
- C . Predictability issues of the train
- D . Activities that lack innovation
What are the three flow accelerators for making value flow without interruptions? (Choose three.)
- A . Reduce Queue Length
- B . Frequent context switching
- C . Increase capacity
- D . Address the systemic problems
- E . Work in Smaller Batches
- F . Visualize and limit work in process (WIP)