The portfolio Vision is an aggregation of every Agile Release Train’s Vision?
- A . True
- B . False
(Select 2) What applies to the Portfolio Backlog?
- A . The Portfolio Kanban holds Capabilities that are ready for implementation.
- B . Programs plan PIs so that they exhaust the Portfolio Backlog and only then work on their local priorities.
- C . It provides a low-cost holding area for approved Business and Enabler Epics.
- D . WSJF is used to prioritize Epics in the Portfolio Backlog.
When does the System Demo happen?
- A . After the Solution Demo, but before PI Planning.
- B . After every Iteration.
- C . On demand.
- D . After continuous integration.
- E . After Pre-PI Planning.
Test automation is typically included in the Definition of Done (DoD).
- A . True
- B . False
(Select 2) When might Feature size not be a good substitute for the duration of WSJF?
- A . The Feature did not originate from a Program Epic.
- B . The Feature involves a team or team members who represent a bottleneck.
- C . The Feature did not originate from a Value Stream Capability.
- D . The Feature involves a remote third-party vendor that has a formal scope-approval process.
- E . The Feature has not yet been broken down into user stories by the Product Owner.
(Select 3) Which of the following have acceptance criteria?
- A . Business Capabilities
- B . Portfolio Enabler Epics
- C . Strategic Themes
- D . Enabler Features
- E . Spikes
- F . Program Epics
You organization decided to thoroughly implement the SAFe Principle "Assume variability; preserve options."
What is the optimum path for success?
- A . Assume variability of scope and preserve options for the release date.
- B . Preserve flexibility in system functionality and design, but have fixed Solution intent.
- C . Assume variability of scope, but have fixed Solution Context.
- D . Preserve flexibility in both system functionality and design.
What is the correct statement about Work in Process (WIP).
- A . The bigger the WIP, the richer the feedback.
- B . The amount of WIP is unrelated to utilization.
- C . Lower WIP limits foster collaboration.
What does Little’s Law tells us?
- A . The easiest way achieve flow is to reduce queue lengths.
- B . Long queues help increase process efficiency.
- C . The easiest way to reduce waits is to increase the processing rate.
- D . The average wait time is dependent on the varying arrival rate of items coming into the queue.