What can you define to ensure that production flow only happens in suitable and physically connected tanks?

Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question.A . Resource matrixB . Resource networkC . Resource hierarchyD . Resource selectionView AnswerAnswer:...

September 13, 2024No CommentsREAD MORE +

Advanced Planning uses master data and transaction data from SAP S/4HANA In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.

Advanced Planning uses master data and transaction data from SAP S/4HANA In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question. A. Work Center B. Production Version C. Material D. plantView AnswerAnswer: A, C Explanation: The Advanced Planning flag is...

September 12, 2024No CommentsREAD MORE +

A. When can you use mode selection?

Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HAN A. When can you use mode selection? A. When multiple production versions are maintained for one product B. When multiple operations are maintained for one product C. When alternative resources are used within one operation...

September 12, 2024No CommentsREAD MORE +

What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 Correct answers to this question?

What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 Correct answers to this question?A . To determine the work in progress along the production lineB . To provide timely updates of inventory management for the staged componentsC . To reduce the total production...

September 11, 2024No CommentsREAD MORE +

What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?

What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?A . The planned order is converted to a production order.B . The planned order's component availability is checked.C . The planned order generates capacity requirementsD . The planned...

September 9, 2024No CommentsREAD MORE +

How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question,

How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question,A . By PlantB . By PeriodC . By IndustryD . By Material StatusView AnswerAnswer: A, B Explanation: You can limit the validity of a BOM by plant and by...

September 8, 2024No CommentsREAD MORE +

How does the system choose the production version?

During production order creation, several valid production versions are found. How does the system choose the production version?A . Lot size or material costB . Validity period or sales orderC . Planned order or material numberD . Alphanumeric or quota arrangementView AnswerAnswer: B Explanation: The system chooses the production version...

September 8, 2024No CommentsREAD MORE +

What are the options if the Dispatched operation status is set for a production order operation? Note: There are 2 correct answers to this question.

What are the options if the Dispatched operation status is set for a production order operation? Note: There are 2 correct answers to this question. A. You can reschedule the operation using finite scheduling in a planning table. B. You can reschedule the operation in the Manage Production Operations app....

September 7, 2024No CommentsREAD MORE +

A. Is the material type allowed in the BOM?

Which of the following questions do you have to answer before you start creating a bill of material (BOM)? A. Is the material type allowed in the BOM? B. Which base unit of measure does the material have? C. What status does the BOM have? D. In which storage location...

September 7, 2024No CommentsREAD MORE +

Which of the following do you have to consider?

For production orders, cost object controlling (COC) can be carried out on an order-related or product- related basis. Which of the following do you have to consider? Note: There are 2 correct answers to this question.A . In pro duct-related COC, all costs are debited and credited to a product...

September 5, 2024No CommentsREAD MORE +