Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.

Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.A . RoutingB . Work CenterC . Bill of material (BOM)D . Material MasterView AnswerAnswer: A, B

February 1, 2024 No Comments READ MORE +

Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA. Note: there are 2 correct answers to this question.

Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA. Note: there are 2 correct answers to this question. A. Manual maintenance B. 100% check C. First in First out (FIFO). D. SimultaneousView AnswerAnswer: A, B

January 31, 2024 No Comments READ MORE +

In which data objects can you set the Advanced Planning flag?

Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question. A. Work Center B. Production Version C. Material D. plantView AnswerAnswer: A, C

January 31, 2024 No Comments READ MORE +

When can consumption of planned independent requirements take place for planning strategy 40 (Planning with final assembly?

When you create a sales order When can consumption of planned independent requirements take place for planning strategy 40 (Planning with final assembly?A . When MRP creates a dependent requirementB . When MRP creates a planned orderC . When you create a sales orderD . When MRP creates a planned...

January 30, 2024 No Comments READ MORE +

Which scheduling strategy do you select?

You want to schedule an operation finitely, without removing other operations. Which scheduling strategy do you select?A . Insert operationB . Squeeze inC . Schedule in working time onlyD . Find SlotView AnswerAnswer: D

January 30, 2024 No Comments READ MORE +

where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 Correct answers to this question.

where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 Correct answers to this question.A . in the bill of material (BOM)B . in the work centersC . in the MRP controllerD . In the routingE . in...

January 30, 2024 No Comments READ MORE +

How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question,

How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question,A . By PlantB . By PeriodC . By IndustryD . By Material StatusView AnswerAnswer: A, B

January 30, 2024 No Comments READ MORE +

Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.

Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.A . Create an object selection variant for priority-category-related alerts.B . Assign the alert profile to the overall profile.C . Create an object selection variant...

January 30, 2024 No Comments READ MORE +

What is the purpose of collective orders?

Generic Parent ยป Generic 1 pt What is the purpose of collective orders?A . To manage production orders for an entire finished product on multiple levelsB . To combine order management of co-products and by-products with the main productC . To post production costs on a cost collector instead of...

January 30, 2024 No Comments READ MORE +

What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?

What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?A . The planned order is converted to a production order.B . The planned order's component availability is checked.C . The planned order generates capacity requirementsD . The planned...

January 29, 2024 No Comments READ MORE +