Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection? A. When multiple operations are maintained for one product B. When alternate resources are used within one operation C. When multiple planned orders exist on one resource D. When...
What determines whether the storage location can be derived from the production version?
An issue storage location was NOT found through the work center, bill of material (BOM) item, or material master . What determines whether the storage location can be derived from the production version?A . MRP group B. Plants parameters C. MRP controller D. MRP profileView AnswerAnswer: A
Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
You have maintained the parameters for simple discontinuation in the material master of a component . Which business process will be affected if the available stock is zero and the discontinuation date is in the past?A . Production order release B. Material requirements planning C. Backflushing D. KanbanView AnswerAnswer: B
How can you achive a feasible production plan in case of capacity constraints?
How can you achive a feasible production plan in case of capacity constraints?A . Select an alternative mode on a resource. B. Adjust the available capacity. C. Reduce the planning window D. Form optimum sequence to reduce setup times E. Execute an infinite production planning runView AnswerAnswer: A,B,D
How can you limit the validity of a bill of material (BOM)?
How can you limit the validity of a bill of material (BOM)?A . By plant B. By material type C. By industry D. By periodView AnswerAnswer: A,D
production order?
What happens to this dependent requirement when you convert the planned order into a production order?A . They are converted into a schedule line. B. They are converted into a reservation. C. They are converted into a production order. D. They are converted into a planned order.View AnswerAnswer: B
What does the material type influence?
What does the material type influence?A . Which plant specific status is allowed B . Which material master views can be maintained C . Which document types are allowed D. Whether the material is produced in-house, procured externally or bouthView AnswerAnswer: B,D
Which of the following is valid sequence of the main activities in production order processing?
Which of the following is valid sequence of the main activities in production order processing?A . Creation, availability check, release, material widrawal, confirmation B. Creation, release, printing, goods issue, confirmation, goods receipt C. Creation, printing, release, goods issue, confirmation, goods receipt D. Creation, release, settlement, goods issue, confirmation, goods receiptView...
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?A . First in first out (FIFO) B. 100% check C. Simultaneous D. By usage probabilityView AnswerAnswer: B,D
What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?
What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?A . The work center has several invidula capacities. B. The finite Scheduling indicator is NOT set in the strategy profile. C. The Change...