Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.
Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.A . Non-stock item B. Work item C. Variable-size item D. WBS itemView AnswerAnswer: A,C
Which information is required when you created a production master in SAP S/4HANA?
Which information is required when you created a production master in SAP S/4HANA?A . Selective screen for views B. Product type C. Base unit of measure D. Industry sectorView AnswerAnswer: A,B
What can you define to ensure that the production flow happens only in physically connected tanks?
Your project used process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?A . Operation network B. Work center hierarchy C. Setup matrix D. Resource networkView AnswerAnswer: B
Which setting do you make to achive this?
You want to set up a make-to-order planing scenario for finished material. The bil of material contains two components: one should be procured for each sales order individually, the other one shold be procured jointly for all independent requirements. Forcasting for the finished product is NOT possible . Which setting...
Which item statuses can you select inside a material BOM?
Which item statuses can you select inside a material BOM?A . Service B. Sales C. Quality management D. EngineeringView AnswerAnswer: B,D
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection? A. When multiple operations are maintained for one product B. When alternate resources are used within one operation C. When multiple planned orders exist on one resource D. When...
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?A . First in first out (FIFO) B. 100% check C. Simultaneous D. By usage probabilityView AnswerAnswer: B,D
What do you need to consider?
Your client is asking for your advice on material master numbering in SAP S/4HANA . What do you need to consider? A. The maximum mater all number length is 40 for external numbers and 18 for internal numbers B. The number of leading zeros for internal numbers is client-specific. C....
When does consuption of planned independent requirements take places?
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?A . When you deliver a sales order B. When the MRP result are saved C. When you create a sales order D. When you create a planned orderView AnswerAnswer: C
production order?
What happens to this dependent requirement when you convert the planned order into a production order?A . They are converted into a schedule line. B. They are converted into a reservation. C. They are converted into a production order. D. They are converted into a planned order.View AnswerAnswer: B