An activity consists of the following elements (more than one answer is true):

An activity consists of the following elements (more than one answer is true):A . Long textB . Processing quality factorC . Short testD . Processing deadlinesE . Catalog entryView AnswerAnswer: ABD

August 26, 2020 No Comments READ MORE +

Which statements are correct? Sampling plan dependent on ________. (More than one answer is true.)

Which statements are correct? Sampling plan dependent on ________. (More than one answer is true.)A . InspectionB . VariableC . Lot size intervalsD . severities/AQL valueView AnswerAnswer: ACD

August 26, 2020 No Comments READ MORE +

You can use the Quality Notifications to support the RMA (Return Material Authorization) process in your company.

You can use the Quality Notifications to support the RMA (Return Material Authorization) process in your company.A . IncorrectB . CorrectView AnswerAnswer: B

August 25, 2020 No Comments READ MORE +

Which statements are correct? (More than one answer is true.)

Which statements are correct? (More than one answer is true.)A . You cannot assign an already existing QM order to a quality notification.B . QM orders can be settled to different account assignment objects.C . The controlling area always forms the first step in the hierarchy of an evaluation.D ....

August 25, 2020 No Comments READ MORE +

In inspection planning, you create material-related information that is used when this material is inspected.

In inspection planning, you create material-related information that is used when this material is inspected.A . IncorrectB . CorrectView AnswerAnswer: B

August 25, 2020 No Comments READ MORE +

The inspection lot is not created for the ship-to party.

The inspection lot is not created for the ship-to party.A . CorrectB . IncorrectView AnswerAnswer: B

August 25, 2020 No Comments READ MORE +

The QM System entered in the quality info record overrides the QM system entered in the vendor master record.

The QM System entered in the quality info record overrides the QM system entered in the vendor master record.A . CorrectB . IncorrectView AnswerAnswer: A

August 25, 2020 No Comments READ MORE +

Which statement is correct?

Which statement is correct?A . Test equipment Calibration takes place at multiple unit level (equipment).B . Test equipment Calibration takes place at single unit level (equipment).View AnswerAnswer: B

August 25, 2020 No Comments READ MORE +

You cannot control inspection lot creation (lot combination) using he inspection type in the material master.

You cannot control inspection lot creation (lot combination) using he inspection type in the material master.A . IncorrectB . CorrectView AnswerAnswer: A

August 24, 2020 No Comments READ MORE +

In which of the following you can display the information for multiple specifications functions and valuate them at characteristic level:

In which of the following you can display the information for multiple specifications functions and valuate them at characteristic level:A . Results Recording WorklistB . Record inspection results for the batchC . Record inspection results for the lotD . Record inspection results for the inspection pointE . Record inspection results...

August 24, 2020 No Comments READ MORE +