You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results? There are 2 correct answers to this question.
- A . SYCM (Simplification Database Content)
- B . SAT (Runtime Analysis)
- C . ATC (ABAP Test Cockpit)
- D . SE80 (Object Navigator)
You are performing an SAP S/4HANA conversion of the development system .
Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)? Please choose the correct answer.
- A . Credentials of a named user in client 000 of the shadow system
- B . Credentials of a named user in the development client of the development system
- C . Credentials of user DDIC in client 000 of the shadow system
- D . Credentials of user DDIC in the development client of the development system
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?
- A . To optimize the migration
- B . To optimize the activation
- C . To optimize the conversion
- D . To optimize the main import
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?
- A . Shadow on target creation
- B . Downtime conversion
- C . Silent data migration (SDM)
- D . Downtime migration
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard".
When will the shadow system be stopped for the last time? Please choose the correct answer.
- A . Before the downtime starts
- B . At the end of the downtime
- C . As part of the cleanup process
- D . Early in the downtime
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"? There are 2 correct answers to this question.
- A . Keep archiving on during the whole procedure.
- B . Use the Near Zero Downtime Maintenance Technology (NZDM).
- C . Reuse a profile for the shadow instance from a previous run.
- D . Choose the instance number of the shadow instance.
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner .
Which kernels do you need to select for the SAP S/4HANA conversion? There are 2 correct answers to this question.
- A . Kernel for target release, Windows, SAP MaxDB
- B . Kernel for target release, Linux, SAP HANA
- C . Kernel for target release, Windows, SAP HANA
- D . Kernel for source release, Windows, SAP MaxDB
You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column .
What does the Calculated level indicate for those software components?
- A . The SAP support packages that will be bound to the conversion
- B . The SAP support packages contained in the upgrade media, calculated by the maintenance planner
- C . The SAP support packages of the support package stack, calculated by the maintenance planner
- D . The SAP support packages in the download directory that are newer than the selected support package stack
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA.
What do you need to consider? Note: there are 2 correct answers to this question.
- A . The source system is non-Unicode and the target database is a scale-out system.
- B . The target database size increases temporarily because of the Shadow Repository.
- C . SAP HANA Landscape Reorganization required a manual step to edit a file.
- D . Network capacity between exporting and importing R3load processes must be.
- E . Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB .
Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.
- A . Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migration SAP S/4HANA conversion without database migration
- B . Unicode conversion SAP S/4HANA conversion including database migration
- C . Unicode conversion SAP S/4HANA conversion without database migration Database migration
- D . SAP S/4HANA conversion including database migration and Unicode conversion
- E . Unicode conversion Database migration SAP S/4HANA conversion without database migration
You are performing an upgrade of an SAP ECC development system with SUM .
What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
- A . After the SUM roadmap step "Execution" is finished and before "Postprocessing"
- B . During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
- C . During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
- D . After the SUM roadmap step "Postprocessing" and post procedure steps are finished
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.
- A . The path was stored in file host_profile during registration
- B . The path was stored to the environment of user <sid>adm during registration
- C . The path is taken from the URL entered in the browser to start SUM
- D . The path was stored in file sumabap conf during registration
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?
- A . After SUM has ended
- B . During the Execution roadmap step
- C . Before the start of the SUM technical downtime
- D . During the SUM technical downtime
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.
- A . It explains the database migration option (DMO) of SUM.
- B . It contains a section about the simplification item (SI) checks.
- C . It explains where to find information about the custom code analysis.
- D . It is a database-specific document.
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?
- A . 750
- B . 700
- C . 731
- D . 740
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
- A . An upgrade of the software components is performed, without changing the database type.
- B . A change of the database type is performed, without changing the software components.
- C . An SAP S/4HANA conversion is performed, without adapting the customer data.
- D . A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?
- A . Downtime Optimized DMO (DoDMO)
- B . Near-Zero Downtime Maintenance (nZDM)
- C . Near-Zero Downtime Technology (NZDT)
- D . Downtime Optimized Data Conversion (DoC)
You are performing an inplace SAP S/4HANA conversion including DMO .
What is the latest point in time when you can reset the procedure without losing data?
- A . The start of the Execution roadmap step
- B . The start of the business downtime
- C . The end of the business downtime
- D . The end of the database migration
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.
- A . Depending on the SAP S/4HANA version, there are different SI check frameworks.
- B . The SI checks are executed in the development system and the results are transported into the subsequent systems.
- C . You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
- D . You need to build up a SI check framework by applying SAP notes.
What is the benefit of using the file UPGANA.XML from a previous SUM run? Please choose the correct answer.
- A . To auto-fill specific fields on selected screens on the SUM UI
- B . To make the progress information within SUM UI more accurate
- C . To repeat specific phases during the SUM run
- D . To skip selected phases during the SUM run
In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question.
- A . When performing an SAP S/4HANA conversion with DMO
- B . When performing an SAP S/4HANA conversion without u DMO
- C . When upgrading an SAP S/4HANA Server system
- D . When upgrading an SAP ECC system with DMO
You are planning an SAP S/4HANA conversion .
Which conversion-specific tasks need to be performed during the preparation phase? There are 2 correct answers to this question.
- A . Run the database migration to the SAP HANA database
- B . Perform the migration of data into the new data structure
- C . Check the compatibility of custom code with SAP S/4HANA
- D . Apply the recommendations of the simplification list
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.
- A . Target DB size will increase temporarily
- B . A
- C . DMO can only be run with systems NW740 or NW731
You are upgrading a three-system landscape DEV – QAS – PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system .
What do you need to consider? Please choose the correct answer.
- A . The upgrade of the PRD must be finished before you start new development in the DEV.
- B . The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
- C . The transport between Unicode and non-Unicode systems is forbidden.
- D . The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
What are the benefits of using the Benchmarking option of the DMO for SUM? There are 2 correct answers to this question.
- A . You can obtain migration duration files that can be used to optimize the next runs from a previous benchmark run.
- B . You can find the optimal number of parallel R31oad processes by monitoring host performance.
- C . You can verify that the content of the download directory matches the stack.XML file.
- D . You can record the modification adjustment during migration and use the transports in the next runs.