SAP E_S4HCON2019 SAP Certified Technology Specialist – SAP S/4HANA Conversion and SAP System Upgrade Online Training
SAP E_S4HCON2019 Online Training
The questions for E_S4HCON2019 were last updated at Dec 19,2024.
- Exam Code: E_S4HCON2019
- Exam Name: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade
- Certification Provider: SAP
- Latest update: Dec 19,2024
Which Guides contain information about SUM phases starting with "EU_CLONE_"? There are 2 correct answers to this question.
- A . The SAP S/HANA Conversion Guide
- B . The Application Guide
- C . The major SUM Guide
- D . The DMO Guide
What are the benefits of using the Benchmarking option of the DMO for SUM? There are 2 correct answers to this question.
- A . You can obtain migration duration files that can be used to optimize the next runs from a previous benchmark run.
- B . You can find the optimal number of parallel R31oad processes by monitoring host performance.
- C . You can verify that the content of the download directory matches the stack.XML file.
- D . You can record the modification adjustment during migration and use the transports in the next runs.
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0? There are 2 correct answers to this question.
- A . Upgrading to SAP ECC 6.08 without using DMO
- B . Using DMO when applying Support Packages to SAP ECC 6.07
- C . SAP S/4HANA conversion to SAP S/4HANA 1709
- D . Updating to SAP ECC 6.07 using DMO
Which preparational steps must be performed for an SAP S/4HANA conversion? There are 2 correct answers to this question.
- A . Uninstall industry extensions not supported by SAP S/4HANA
- B . Install add-on SAP Gateway 7.50
- C . Uninstall Fiori apps not released for SAP_UI 7.50
- D . Delete client 066 (Early Watch Client)
You want to execute a Unicode Conversion only.
Which approach do you need to follow? Please choose the correct answer.
- A . SWPM using the Backup / Restore procedure
- B . SUM with DMO
- C . SUM without DMO
- D . SWPM using the Load procedure
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.
- A . Depending on the SAP S/4HANA version, there are different SI check frameworks.
- B . The SI checks are executed in the development system and the results are transported into the subsequent systems.
- C . You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
- D . You need to build up a SI check framework by applying SAP notes.
You are planning an SAP S/4HANA conversion.
Which conversion-specific tasks need to be performed during the preparation phase? There are 2 correct answers to this question.
- A . Run the database migration to the SAP HANA database
- B . Perform the migration of data into the new data structure
- C . Check the compatibility of custom code with SAP S/4HANA
- D . Apply the recommendations of the simplification list
During the SUM procedure, the phase XPRAS_AIMMRG fails.
Where can you most likely see the reason for the error? There are 2 correct answers to this question.
- A . In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
- B . In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
- C . In the job log for the corresponding job in SM37 (Job Overview)
- D . In the corresponding R3trans log files of this phase
What do you do to prepare the database migration option of a SUM procedure? There are 3 correct answers
- A . Extract the SAP HANA database installation archive
- B . Move the stack.xml update file into the download folder
- C . Extract the SAP HANA client installation archive
- D . Move the SAPM update archive into the download folder
- E . Move the R3trans update archive into the download folder
You are performing an upgrade of an SAP ECC development system with SUM.
What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system? Please choose the correct answer.
- A . After the SUM roadmap step "Execution" is finished and before "Postprocessing"
- B . During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
- C . During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
- D . After the SUM roadmap step "Postprocessing" and post procedure steps are finished