When are referential joins executed in analytical views? Choose the correct answer
- A . When all the tables are optimized
- B . When fields are selected
- C . When fields are optimized
- D . When fields from both the tables are requested
Which of the following take advantage of the computing power of multiple CPUs used by SAP HANA? There are 2 correct answers to this question.
- A . Partitioning
- B . Database table compression
- C . Column data storage
- D . Parallel processing
Which is the new concept that is introduced and improved by using SAP HANA Specific Features? Please choose the correct answer.
- A . Programming model
- B . Table buffering
- C . New advanced SQL syntax Procedures
- D . ABAP-Managed Database Procedures
What made SAP HANA possible?
- A . There are 2 correct answers to this question.
- B . Improved hardware technology
- C . CPU with single core network
- D . RAM limitation
- E . Technology and innovations
When to use Enhanced Open SQL? There are 2 correct answers to this question.
- A . To view scalar components
- B . At the time of Dictionary Views
- C . Need the query in one piece of code only
- D . To access system fields
Name the views that are available to administer and monitor one or several SAP HANA systems? There are 2 correct answers to this question
- A . The Landscape view
- B . The System Monitor view
- C . The Security view
- D . The Administration view
You use the ABAP trace (SAT) to measure the run time of a program. In a class, method X checks the validity of its importing parameters and calls method Y.
What pattern of gross and net run time would you expect to see the in the ABAP trace results for method X? Please choose the correct answer.
- A . The gross and net run times are identical
- B . The net run time is less than the gross run time
- C . The net run time is equal to Zero
- D . The net run time is greater than the gross run time
Which of the following are view annotations for a CDS view? There are 3 correct answers to this question.
- A . Semantics
- B . Client handling
- C . Buffering type
- D . Environment
- E . Access control
What are the Parameters for Analytical and Calculation view? There are 3 correct answers to this question.
- A . Specifying unit of measurement
- B . Passing other values to be used in calculations
- C . Create a copy of a report
- D . To store data for critical analysis
- E . Setting a filter for columns
What is the purpose of an ABAP project in ABAP Development Tool for eclipse? There are 2 correct answers to this question
- A . It represents the connection to an ABAP System
- B . It provides access to all ABAP repository objects in an ABAP system
- C . It represents the connection to the SAP HANA Layer
- D . It is used to transport the ABAP repository Objects.