You want to derive the profitability segment for a line item in the universal journal using SAP S/4HANA standard configuration.
What requirements must be fulfilled? Note: There are 2 correct answers to this question.
- A . Costing-based Profitability Analysis must be active.
- B . Account-based Profitability Analysis must be active.
- C . The type of the addressed ledger must be an extension ledger.
- D . The type of the general ledger account must be primary cost/revenue or secondary cost.
What parameters can you set up when defining order types?
- A . Define document type.
- B . Define default parameters for master record fields.
- C . Define source structure.
- D . Allow revenue postings.
You want enable WIP calculation in Product Cost by Period.
What do you need to configure?
- A . Settlement profile
- B . Valuation variant
- C . Profitability Analysis (PA) transfer structure
- D . Variance variant
Which of the following values can be calculated using result analysis? Note: There are 3 correct answers to this question.
- A . Cost of sales
- B . Reserves for unrealized costs
- C . Cost of goods manufactured
- D . Gross margin
- E . Work in progress
Which receiver must be allowed in the settlement profile of product cost collector?
- A . Cost center
- B . Material
- C . Order
- D . G/L Account
You have activated budget availability control against the overall value for an internal order and entered an overall budget of 10000.
Actuals of 10000 were posted in the previous year.
You are surprised to realize that a purchase order 1000 was created for this internal order in the current year.
How is that possible? Note: There are 2 correct answers to this question.
- A . The purchase order has NOT generated a budget yet.
- B . The purchase order was entered in a different year than the budget.
- C . The cost element is exempted from budget availability control.
- D . The difference of 1000 is within the tolerance limits defined in the configuration.
In which module do you process profit center allocations in SAP S/4HANA?
- A . Product cost accounting
- B . General ledger accounting
- C . Account-based profitability analysis
- D . Cost center accounting
Which setting in the cost center master data do you use to assign the same attributes to similar cost center?
- A . Cost center category
- B . Cost center type
- C . Object class
- D . Standard hierarchy node
What can you configure in the settlement profile? Note: There are 2 correct answers to this question.
- A . Define document management parameters.
- B . Determine an overhead key.
- C . Determine whether settlement is required.
- D . Define a number range for settlement document.
Which of the following steps are part of the procedure to update the standard price of the material? Note: There are 2 correct answers to this question.
- A . Release the cost estimate.
- B . Archive the cost estimates.
- C . Mark the cost estimate.
- D . Split the costs.