Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.
- A . Create an object selection variant for priority-category-related alerts.
- B . Assign the alert profile to the overall profile.
- C . Create an object selection variant for production-planning-related alerts.
- D . Assign the overall profile to the authorization profile.
where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 Correct answers to this question.
- A . in the bill of material (BOM)
- B . in the work centers
- C . in the MRP controller
- D . In the routing
- E . in the production version
You use planning strategy Finite Scheduling with Reverse and want to allow scheduling the past.
How can you parameterize this in the strategy profile?
- A . Specify a negative planning horizon.
- B . Specify a positive planning horizon.
- C . Specify a positive offset time.
- D . Specify a negative offset time.
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 Correct answers to this question?
- A . To determine the work in progress along the production line
- B . To provide timely updates of inventory management for the staged components
- C . To reduce the total production lead time for a long production line
- D . To stage different components for a production line simultaneously
Generic Parent » Generic 1 pt
What is the purpose of collective orders?
- A . To manage production orders for an entire finished product on multiple levels
- B . To combine order management of co-products and by-products with the main product
- C . To post production costs on a cost collector instead of the production order
- D . To post any component withdrawal as single backflush with order confirmation
You want to schedule an operation finitely, without removing other operations.
Which scheduling strategy do you select?
- A . Insert operation
- B . Squeeze in
- C . Schedule in working time only
- D . Find Slot
When you create a sales order
When can consumption of planned independent requirements take place for planning strategy 40 (Planning with final assembly?
- A . When MRP creates a dependent requirement
- B . When MRP creates a planned order
- C . When you create a sales order
- D . When MRP creates a planned order
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A . The planned order is converted to a production order.
- B . The planned order’s component availability is checked.
- C . The planned order generates capacity requirements
- D . The planned order’s components are copied to the picking list.
During production order creation, several valid production versions are found.
How does the system choose the production version?
- A . Lot size or material cost
- B . Validity period or sales order
- C . Planned order or material number
- D . Alphanumeric or quota arrangement
What data can you maintain in the subitems of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A . Installation point
- B . Item type
- C . Quantity
- D . Scrap percentage
Your production planners must execute planning only for specific resources.
How can you achieve this in Advanced Planning (PP/DS)?
- A . Use a propagation range.
- B . Use a resource group
- C . Use a planning area.
- D . Use a planning group.
in your Plant, MRP is activated.
which options do you have to exclude a material from the MRP run? Note: there are 2 correct answers to this question.
- A . Use a specific material status
- B . Use a specific material group
- C . Use a specific MRP type
- D . Use a specific MRP list
How can you support a GMP (Good Manufacturing Practice)-compliant production process? Note: There are 3 correct answers to this question.
- A . Approved resources
- B . Digital signature
- C . Batch record
- D . GMP-compliant flag
- E . Recipe approval
How can you support a GMP (Good Manufacturing Practice)-compliant production process? Note: There are 3 correct answers to this question.
- A . Approved resources
- B . Digital signature
- C . Batch record
- D . GMP-compliant flag
- E . Recipe approval
Your project uses process orders for the production of liquid chemicals.
What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question.
- A . Resource matrix
- B . Resource network
- C . Resource hierarchy
- D . Resource selection
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question,
- A . By Plant
- B . By Period
- C . By Industry
- D . By Material Status
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.
- A . To increase the number of planning levels
- B . To simplify the structure of bills of material
- C . To reduce the number of material masters
- D . To make the assignment of components easier
- E . To reduce the number of changes required in bills of material
Which of the following questions do you have to answer before you start creating a bill of material (BOM)?
- A . Is the material type allowed in the BOM?
- B . Which base unit of measure does the material have?
- C . What status does the BOM have?
- D . In which storage location is the BOM required?
Advanced Planning uses master data and transaction data from SAP S/4HANA.
In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.
- A . Work Center
- B . Production Version
- C . Material
- D . plant
What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question
- A . Queue
- B . Teardown time
- C . Move time
- D . Setup Time
Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question.
- A . setup time
- B . Opening Period
- C . Float after Production
- D . Total replenishment lead time
For production orders, cost object controlling (COC) can be carried out on an order-related or product- related basis.
Which of the following do you have to consider? Note: There are 2 correct answers to this question.
- A . In pro duct-related COC, all costs are debited and credited to a product cost collector.
- B . Order-related COC is beneficial in a flexible production environment
- C . Product-related COC is used in manufacturing for co-products
- D . In order-related COC, individual production orders do NOT have cost segments.
You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received.
Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
- A . Planning with final assembly (40)
- B . Production by lot size (30)
- C . Planning at assembly level (70)
- D . Make-to-order production (20)
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA. Note: there are 2 correct answers to this question.
- A . Manual maintenance
- B . 100% check
- C . First in First out (FIFO).
- D . Simultaneous
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.
- A . Changing the storage bin in warehouse management
- B . Changing the procurement type in the product master
- C . Changing the operation times in the production data structure
- D . Changing the stock in inventory management
- E . Changing the purchasing contract in materials management
What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.
- A . Order type
- B . Planning strategy
- C . Requirements profile
- D . Requirements type
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
- A . Fill up to the maximum stock level.
- B . Fill up to the safety stock level.
- C . Fill up based on the lot size procedure.
- D . Fill up to the reorder stock level.
Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.
- A . Routing
- B . Work Center
- C . Bill of material (BOM)
- D . Material Master
What are the options if the Dispatched operation status is set for a production order operation? Note: There are 2 correct answers to this question.
- A . You can reschedule the operation using finite scheduling in a planning table.
- B . You can reschedule the operation in the Manage Production Operations app.
- C . You can reschedule the operation using infinite scheduling in a planning table
- D . You can reschedule the operation using midpoint scheduling in a planning table.
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
- A . Move Time
- B . Pick/pack time
- C . Setup time
- D . Float before production
- E . Queue time