Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question.
- A . setup time
- B . Opening Period
- C . Float after Production
- D . Total replenishment lead time
For production orders, cost object controlling (COC) can be carried out on an order-related or product- related basis.
Which of the following do you have to consider? Note: There are 2 correct answers to this question.
- A . In pro duct-related COC, all costs are debited and credited to a product cost collector.
- B . Order-related COC is beneficial in a flexible production environment
- C . Product-related COC is used in manufacturing for co-products
- D . In order-related COC, individual production orders do NOT have cost segments.
You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received.
Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
- A . Planning with final assembly (40)
- B . Production by lot size (30)
- C . Planning at assembly level (70)
- D . Make-to-order production (20)
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA. Note: there are 2 correct answers to this question.
- A . Manual maintenance
- B . 100% check
- C . First in First out (FIFO).
- D . Simultaneous
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.
- A . Changing the storage bin in warehouse management
- B . Changing the procurement type in the product master
- C . Changing the operation times in the production data structure
- D . Changing the stock in inventory management
- E . Changing the purchasing contract in materials management
What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.
- A . Order type
- B . Planning strategy
- C . Requirements profile
- D . Requirements type
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
- A . Fill up to the maximum stock level.
- B . Fill up to the safety stock level.
- C . Fill up based on the lot size procedure.
- D . Fill up to the reorder stock level.
Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.
- A . Routing
- B . Work Center
- C . Bill of material (BOM)
- D . Material Master
What are the options if the Dispatched operation status is set for a production order operation? Note: There are 2 correct answers to this question.
- A . You can reschedule the operation using finite scheduling in a planning table.
- B . You can reschedule the operation in the Manage Production Operations app.
- C . You can reschedule the operation using infinite scheduling in a planning table
- D . You can reschedule the operation using midpoint scheduling in a planning table.
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
- A . Move Time
- B . Pick/pack time
- C . Setup time
- D . Float before production
- E . Queue time