Which item statuses can you select inside a material BOM?
- A . Service
- B . Sales
- C . Quality management
- D . Engineering
Your client is asking for your advice on material master numbering in SAP S/4HANA .
What do you need to consider?
- A . The maximum mater all number length is 40 for external numbers and 18 for internal numbers
- B . The number of leading zeros for internal numbers is client-specific.
- C . In Customizing you can decide by material type whether to use the long material number.
- D . The display template for material numbers applies to all clients.
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
- A . First in first out (FIFO)
- B . 100% check
- C . Simultaneous
- D . By usage probability
What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?
- A . The work center has several invidula capacities.
- B . The finite Scheduling indicator is NOT set in the strategy profile.
- C . The Change Planning Direction indicator is set in strategy profile.
- D . Alternative work centers are fully occupied.
You want to set up a make-to-order planing scenario for finished material. The bil of material contains two components: one should be procured for each sales order individually, the other one shold be procured jointly for all independent requirements. Forcasting for the finished product is NOT possible .
Which setting do you make to achive this?
- A . Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Mixed MRP indicator
- B . Choose planning strategy 20 (Make-to-order) and select corresponding Invidual/collective indicator
- C . Choose planning strategy 20 (Make-to-order) and select corresponding Mixed MRP indicator
- D . Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Invidual/collective indicator
What happens to this dependent requirement when you convert the planned order into a
production order?
- A . They are converted into a schedule line.
- B . They are converted into a reservation.
- C . They are converted into a production order.
- D . They are converted into a planned order.
You have maintained the parameters for simple discontinuation in the material master of a component .
Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
- A . Production order release
- B . Material requirements planning
- C . Backflushing
- D . Kanban
During production order creation, several valid production versions are found .
How does the system choose the production version?
- A . Planned order or material number
- B . Valid period or sale order
- C . Alphanumeric or quota arrangement
- D . Lot size or material cost
Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?
- A . Create object selection variant for transportation lane-related alerts.
- B . Create object selection variant for product-related alerts.
- C . Assign the overall profile to the authorization profile.
- D . Assign the alert profile to the overall profile.
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?
- A . Material Requirements Planning (MRP)
- B . Capacity Requirements Planning (CRP)
- C . Supply Network Planning (SNP)
- D . Demand Planning (DP)