You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched .
How does the insertion take place?
- A . The previously dispatched operation stays as is; the new operation is inserted after the the dispatched operation.
- B . The previously dispatched operation stays as is; the new operation is inserted before the the dispatched operation.
- C . The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
- D . The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
Which information is required when you created a production master in SAP S/4HANA?
- A . Selective screen for views
- B . Product type
- C . Base unit of measure
- D . Industry sector
Why would you use phantom assemblies?
- A . To simplify the structure of bills of materials
- B . To make the assignment of components easier
- C . To reduce the number of changes required in bills of materials
- D . To reduce the number of material masters
- E . To increase the number of planning levels
Which SAP application can be used for forcasting in Supply Chain Planning?
- A . Material Requirements Planning (MRP)
- B . Supply Chain Management(SCM)
- C . Integrated Business Planning (IBP)
- D . Capacity Requirements Planning (CRP)
For what production type are production orders used?
- A . Process manufacturing processes
- B . Replenishment controlled by control cycles
- C . Discrete manufacturing processes
- D . Period and quantity-oriented production
You want to reduce planning efforts for B/C materials .
Which planning procedure do you recommend?
- A . Material requirements planning
- B . Manual planning without check
- C . Forecast planning
- D . Consumption-based planning
You are working with planning strategy 40 (Planning-with-final assembly)
When does consuption of planned independent requirements take places?
- A . When you deliver a sales order
- B . When the MRP result are saved
- C . When you create a sales order
- D . When you create a planned order
An issue storage location was NOT found through the work center, bill of material (BOM) item, or material master .
What determines whether the storage location can be derived from the production version?
- A . MRP group
- B . Plants parameters
- C . MRP controller
- D . MRP profile
How can you achive a feasible production plan in case of capacity constraints?
- A . Select an alternative mode on a resource.
- B . Adjust the available capacity.
- C . Reduce the planning window
- D . Form optimum sequence to reduce setup times
- E . Execute an infinite production planning run
Which of the following is valid sequence of the main activities in production order processing?
- A . Creation, availability check, release, material widrawal, confirmation
- B . Creation, release, printing, goods issue, confirmation, goods receipt
- C . Creation, printing, release, goods issue, confirmation, goods receipt
- D . Creation, release, settlement, goods issue, confirmation, goods receipt
What is the difference between co-products and by-products?
- A . Only co-products appear in the process or production order settlement rule.
- B . Only co-products can be manufactured in isolation from the main product.
- C . Only co-products are identified by a special item category in the bill of material (BOM).
- D . Only by-products have a zero inventory valuation.
Where do you maintain the work center that represents the production line for repetitive manufacturing?
- A . Production version
- B . Routing
- C . Repetitive manufacturing profile
- D . Production cost collector
You want to use capacity availability checks for production orders .
Which settings have to be made for this?
- A . A checking rule must be assigned in the checking control
- B . The PRT Availability Check must be set in the checking control.
- C . An overall profile must be assigned in the checking control.
- D . The Relevant for Finite Scheduling indicator must be set
For a production version to be valid and consistent what requirements must be fulfilled?
- A . The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- B . The assigned routing must NOT have alternative sequences.
- C . The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
- D . The lot size range must be within the lot-size range of the assigned routing.
- E . The assigned routing must be a rate routing.
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
- A . When multiple operations are maintained for one product
- B . When alternate resources are used within one operation
- C . When multiple planned orders exist on one resource
- D . When multiple production versions are maintained for one product
What does the material type influence?
- A . Which plant specific status is allowed
- B . Which material master views can be maintained
- C . Which document types are allowed
- D . Whether the material is produced in-house, procured externally or bouth
What type of time element can be reduced by strategy settings while dispatching?
- A . Transportation time
- B . Wait time
- C . Queue time
- D . Setup time
How can you limit the validity of a bill of material (BOM)?
- A . By plant
- B . By material type
- C . By industry
- D . By period
Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?
- A . Operation network
- B . Work center hierarchy
- C . Setup matrix
- D . Resource network
Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A . Non-stock item
- B . Work item
- C . Variable-size item
- D . WBS item
Which item statuses can you select inside a material BOM?
- A . Service
- B . Sales
- C . Quality management
- D . Engineering
Your client is asking for your advice on material master numbering in SAP S/4HANA .
What do you need to consider?
- A . The maximum mater all number length is 40 for external numbers and 18 for internal numbers
- B . The number of leading zeros for internal numbers is client-specific.
- C . In Customizing you can decide by material type whether to use the long material number.
- D . The display template for material numbers applies to all clients.
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
- A . First in first out (FIFO)
- B . 100% check
- C . Simultaneous
- D . By usage probability
What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?
- A . The work center has several invidula capacities.
- B . The finite Scheduling indicator is NOT set in the strategy profile.
- C . The Change Planning Direction indicator is set in strategy profile.
- D . Alternative work centers are fully occupied.
You want to set up a make-to-order planing scenario for finished material. The bil of material contains two components: one should be procured for each sales order individually, the other one shold be procured jointly for all independent requirements. Forcasting for the finished product is NOT possible .
Which setting do you make to achive this?
- A . Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Mixed MRP indicator
- B . Choose planning strategy 20 (Make-to-order) and select corresponding Invidual/collective indicator
- C . Choose planning strategy 20 (Make-to-order) and select corresponding Mixed MRP indicator
- D . Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Invidual/collective indicator
What happens to this dependent requirement when you convert the planned order into a
production order?
- A . They are converted into a schedule line.
- B . They are converted into a reservation.
- C . They are converted into a production order.
- D . They are converted into a planned order.
You have maintained the parameters for simple discontinuation in the material master of a component .
Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
- A . Production order release
- B . Material requirements planning
- C . Backflushing
- D . Kanban
During production order creation, several valid production versions are found .
How does the system choose the production version?
- A . Planned order or material number
- B . Valid period or sale order
- C . Alphanumeric or quota arrangement
- D . Lot size or material cost
Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?
- A . Create object selection variant for transportation lane-related alerts.
- B . Create object selection variant for product-related alerts.
- C . Assign the overall profile to the authorization profile.
- D . Assign the alert profile to the overall profile.
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?
- A . Material Requirements Planning (MRP)
- B . Capacity Requirements Planning (CRP)
- C . Supply Network Planning (SNP)
- D . Demand Planning (DP)