What is the difference between co-products and by-products?
- A . Only co-products appear in the process or production order settlement rule.
- B . Only co-products can be manufactured in isolation from the main product.
- C . Only co-products are identified by a special item category in the bill of material (BOM).
- D . Only by-products have a zero inventory valuation.
Where do you maintain the work center that represents the production line for repetitive manufacturing?
- A . Production version
- B . Routing
- C . Repetitive manufacturing profile
- D . Production cost collector
You want to use capacity availability checks for production orders .
Which settings have to be made for this?
- A . A checking rule must be assigned in the checking control
- B . The PRT Availability Check must be set in the checking control.
- C . An overall profile must be assigned in the checking control.
- D . The Relevant for Finite Scheduling indicator must be set
For a production version to be valid and consistent what requirements must be fulfilled?
- A . The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- B . The assigned routing must NOT have alternative sequences.
- C . The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
- D . The lot size range must be within the lot-size range of the assigned routing.
- E . The assigned routing must be a rate routing.
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
- A . When multiple operations are maintained for one product
- B . When alternate resources are used within one operation
- C . When multiple planned orders exist on one resource
- D . When multiple production versions are maintained for one product
What does the material type influence?
- A . Which plant specific status is allowed
- B . Which material master views can be maintained
- C . Which document types are allowed
- D . Whether the material is produced in-house, procured externally or bouth
What type of time element can be reduced by strategy settings while dispatching?
- A . Transportation time
- B . Wait time
- C . Queue time
- D . Setup time
How can you limit the validity of a bill of material (BOM)?
- A . By plant
- B . By material type
- C . By industry
- D . By period
Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?
- A . Operation network
- B . Work center hierarchy
- C . Setup matrix
- D . Resource network
Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A . Non-stock item
- B . Work item
- C . Variable-size item
- D . WBS item