SAP C_TS422_2021 SAP Certified Application Associate – SAP S/4HANA Production Planning and Manufacturing Online Training
SAP C_TS422_2021 Online Training
The questions for C_TS422_2021 were last updated at Nov 15,2024.
- Exam Code: C_TS422_2021
- Exam Name: SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing
- Certification Provider: SAP
- Latest update: Nov 15,2024
You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched .
How does the insertion take place?
- A . The previously dispatched operation stays as is; the new operation is inserted after the the dispatched operation.
- B . The previously dispatched operation stays as is; the new operation is inserted before the the dispatched operation.
- C . The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
- D . The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
Which information is required when you created a production master in SAP S/4HANA?
- A . Selective screen for views
- B . Product type
- C . Base unit of measure
- D . Industry sector
Why would you use phantom assemblies?
- A . To simplify the structure of bills of materials
- B . To make the assignment of components easier
- C . To reduce the number of changes required in bills of materials
- D . To reduce the number of material masters
- E . To increase the number of planning levels
Which SAP application can be used for forcasting in Supply Chain Planning?
- A . Material Requirements Planning (MRP)
- B . Supply Chain Management(SCM)
- C . Integrated Business Planning (IBP)
- D . Capacity Requirements Planning (CRP)
For what production type are production orders used?
- A . Process manufacturing processes
- B . Replenishment controlled by control cycles
- C . Discrete manufacturing processes
- D . Period and quantity-oriented production
You want to reduce planning efforts for B/C materials .
Which planning procedure do you recommend?
- A . Material requirements planning
- B . Manual planning without check
- C . Forecast planning
- D . Consumption-based planning
You are working with planning strategy 40 (Planning-with-final assembly)
When does consuption of planned independent requirements take places?
- A . When you deliver a sales order
- B . When the MRP result are saved
- C . When you create a sales order
- D . When you create a planned order
An issue storage location was NOT found through the work center, bill of material (BOM) item, or material master .
What determines whether the storage location can be derived from the production version?
- A . MRP group
- B . Plants parameters
- C . MRP controller
- D . MRP profile
How can you achive a feasible production plan in case of capacity constraints?
- A . Select an alternative mode on a resource.
- B . Adjust the available capacity.
- C . Reduce the planning window
- D . Form optimum sequence to reduce setup times
- E . Execute an infinite production planning run
Which of the following is valid sequence of the main activities in production order processing?
- A . Creation, availability check, release, material widrawal, confirmation
- B . Creation, release, printing, goods issue, confirmation, goods receipt
- C . Creation, printing, release, goods issue, confirmation, goods receipt
- D . Creation, release, settlement, goods issue, confirmation, goods receipt