Where do you maintain the duration of a production operation?
- A . Bill of material (BOM)
- B . Work instructions
- C . Material master
- D . Routing
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received .
Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
- A . Make-to-order production (20)
- B . Planning without final assembly (50)
- C . Planning with final assembly (40)
- D . Planning at assembly level (70)
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor .
How can you process consumption postings?
- A . Kanban
- B . Picking list
- C . Backflushing
- D . Transfer Order
For a production version to be valid and consistent what requirements must be fulfilled?
Note: There are 3 correct answers to this question.
- A . The lot size range must be within the lot-size range of the assigned routing.
- B . The assigned routing must be a rate routing.
- C . The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
- D . The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- E . The assigned routing must NOT have alternative sequences.
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A . Functional Location BOM
- B . Sales Order BOM
- C . Class BOM
- D . Work Center BOM
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.
- A . Market intelligence
- B . Past quotation quantities
- C . Past procurement quantities
- D . One-off events
- E . Past sales order quantities
In your project,you have several materials that are planned by different people .
How can
you assign the planning responsibility?
- A . MRP type
- B . MRP group
- C . MRP controller
- D . MRP planning file
What are the possible results of a production planning run in Advanced Planning (PP/OS)? Note: There are 3 correct answers to this question.
- A . Stock transport order
- B . Production order
- C . Scheduling agreement schedule line
- D . Purchase requisition
- E . Planned order
You want to reduce planning efforts for B/C materials .
Which planning procedure do you recommend?
- A . Manual planning without check
- B . Forecast planning
- C . Material requirements planning
- D . Consumption-based planning
How can SAP S/4HANA support a GMP compliant production process? Note: There are 3 correct answers to this question.
- A . Documentation of quality data with Quality Management
- B . Predefined GMP compliant process order types to meet audit requirements
- C . Use of the GMP compliant flag in relevant master data applications
- D . Use of the digital signature function to check and run business processes
- E . Recipe approval (with Engineering Change Management)
What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.
- A . Create object selection variant for transportation lane-related alerts.
- B . Assign the alert profile to the overall profile.
- C . Create object selection variant for product-related alerts.
- D . Assign the overall profile to the authorization profile.
- E . Create object selection variant for resource-related alerts
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.
- A . Maximum stock level
- B . Purchase orders
- C . Safety stock
- D . Lot size
In which data objects do you maintain the production line as the work center for repetitive manufacturing? Note: There are 2 correct answers to this question.
- A . Production version
- B . Production cost collector
- C . Routing
- D . Repetitive manufacturing profile
What is a work center hierarchy in SAP S/4HANA capacity planning?
- A . A group of alternative work centers for production, structured in hierarchy levels by prior ties
- B . A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel
- C . A group of work centers in a production line being used in sequence for production
- D . A group of alternative work centers providing a cumulative available capacity for production
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing .
What is the impact of this decision? Note: There are 3 correct answers to this question.
- A . Sales order-specific planning run is required.
- B . Sales order-specific stock is created
- C . Net requirements calculation is sales order-specific.
- D . Storage location MRP areas are required.
- E . Production orders are created with sales order reference.
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.
- A . Archiving of documents for assembly scrap
- B . Posting of production costs to the production cost collector
- C . Reduction of associated capacity requirements
- D . Material staging for next order in sequence
- E . Posting of goods receipt for the product
In your plant, MRP is activated .
Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question.
- A . Use a specific material status.
- B . Use a specific MRP controller.
- C . Use a specific material group
- D . Use a specific MRP type.
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
- A . When multiple planned orders exists in one resource
- B . When alternate resourcesare used within one operation
- C . When multiple production versions are maintained for one product
- D . When multiple operations are maintained for one product
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.
- A . To make the assignment of components easier
- B . To simplify the structure of bills of material
- C . To reduce the number of changes required in bills of material
- D . To increase the number of planning levels
- E . To reduce the number of material masters
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production .
How can you identify all affected finished goods stocks?
- A . Use the material staging report.
- B . Use the batch information cockpit.
- C . Use the material where-used report.
- D . Use batch determination.
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.
- A . By-products
- B . Bulk materials
- C . Waste products
- D . Continuous flow materials
- E . Co-products
You have maintained the parameters for simple discontinuation the material master of a component .
Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
- A . Back flushing
- B . Material requirements planning
- C . Production order release
- D . Kanban
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible .
Which settings do you make to achieve this?
- A . Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator
- B . Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
- C . Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
- D . Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.
- A . Work center
- B . Material
- C . Production version
- D . Plant
You want to create a production order from a planned order .
What methods could you use?
Note: There are 2 correct answers to this question.
- A . Full conversion
- B . Order release
- C . Individual conversion
- D . Partial conversion
Duringproduction order creation, several valid production versions are found .
How does the system choose the product conversion?
- A . Validity period or sales order
- B . Lot size or material cost
- C . Alphanumeric or quota arrangement
- D . Planned order or materialnumber
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note:
There are 2 correct answers to this question.
- A . To determine the work in progress along the production line
- B . To provide timely updates of inventory management for the staged components
- C . To stage different components for a production line simultaneously
- D . To reduce the total production lead time for along production line
You want to schedule an operation finitely, without moving other operations .
Which scheduling strategy do you select?
- A . Scheduling working time only
- B . Find Slot
- C . Insert operation
- D . Squeezing
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?
- A . The least restrictive status
- B . The cross-plant status
- C . The plant-specific status
- D . The most restrictive status
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.
- A . Fixed pegging (on/off)
- B . Planning mode (bucket/sequence)
- C . Finiteness level (0…1)
- D . Direction (forward/backward)
- E . Scheduling control (finite/infinite)