Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.
- A . By-products
- B . Bulk materials
- C . Waste products
- D . Continuous flow materials
- E . Co-products
You have maintained the parameters for simple discontinuation the material master of a component .
Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
- A . Back flushing
- B . Material requirements planning
- C . Production order release
- D . Kanban
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible .
Which settings do you make to achieve this?
- A . Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator
- B . Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
- C . Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
- D . Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.
- A . Work center
- B . Material
- C . Production version
- D . Plant
You want to create a production order from a planned order .
What methods could you use?
Note: There are 2 correct answers to this question.
- A . Full conversion
- B . Order release
- C . Individual conversion
- D . Partial conversion
Duringproduction order creation, several valid production versions are found .
How does the system choose the product conversion?
- A . Validity period or sales order
- B . Lot size or material cost
- C . Alphanumeric or quota arrangement
- D . Planned order or materialnumber
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note:
There are 2 correct answers to this question.
- A . To determine the work in progress along the production line
- B . To provide timely updates of inventory management for the staged components
- C . To stage different components for a production line simultaneously
- D . To reduce the total production lead time for along production line
You want to schedule an operation finitely, without moving other operations .
Which scheduling strategy do you select?
- A . Scheduling working time only
- B . Find Slot
- C . Insert operation
- D . Squeezing
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?
- A . The least restrictive status
- B . The cross-plant status
- C . The plant-specific status
- D . The most restrictive status
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.
- A . Fixed pegging (on/off)
- B . Planning mode (bucket/sequence)
- C . Finiteness level (0…1)
- D . Direction (forward/backward)
- E . Scheduling control (finite/infinite)