SAP C_TS422_2020 SAP Certified Application Associate – SAP S/4HANA Production Planning and Manufacturing Online Training
SAP C_TS422_2020 Online Training
The questions for C_TS422_2020 were last updated at Dec 19,2024.
- Exam Code: C_TS422_2020
- Exam Name: SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing
- Certification Provider: SAP
- Latest update: Dec 19,2024
What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.
- A . Create object selection variant for transportation lane-related alerts.
- B . Assign the alert profile to the overall profile.
- C . Create object selection variant for product-related alerts.
- D . Assign the overall profile to the authorization profile.
- E . Create object selection variant for resource-related alerts
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.
- A . Maximum stock level
- B . Purchase orders
- C . Safety stock
- D . Lot size
In which data objects do you maintain the production line as the work center for repetitive manufacturing? Note: There are 2 correct answers to this question.
- A . Production version
- B . Production cost collector
- C . Routing
- D . Repetitive manufacturing profile
What is a work center hierarchy in SAP S/4HANA capacity planning?
- A . A group of alternative work centers for production, structured in hierarchy levels by prior ties
- B . A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel
- C . A group of work centers in a production line being used in sequence for production
- D . A group of alternative work centers providing a cumulative available capacity for production
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing .
What is the impact of this decision? Note: There are 3 correct answers to this question.
- A . Sales order-specific planning run is required.
- B . Sales order-specific stock is created
- C . Net requirements calculation is sales order-specific.
- D . Storage location MRP areas are required.
- E . Production orders are created with sales order reference.
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.
- A . Archiving of documents for assembly scrap
- B . Posting of production costs to the production cost collector
- C . Reduction of associated capacity requirements
- D . Material staging for next order in sequence
- E . Posting of goods receipt for the product
In your plant, MRP is activated .
Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question.
- A . Use a specific material status.
- B . Use a specific MRP controller.
- C . Use a specific material group
- D . Use a specific MRP type.
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
- A . When multiple planned orders exists in one resource
- B . When alternate resourcesare used within one operation
- C . When multiple production versions are maintained for one product
- D . When multiple operations are maintained for one product
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.
- A . To make the assignment of components easier
- B . To simplify the structure of bills of material
- C . To reduce the number of changes required in bills of material
- D . To increase the number of planning levels
- E . To reduce the number of material masters
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production .
How can you identify all affected finished goods stocks?
- A . Use the material staging report.
- B . Use the batch information cockpit.
- C . Use the material where-used report.
- D . Use batch determination.