Question #1

You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched .

How does the insertion take place?

  • A . The previously dispatched operation stays as is; the new operation is inserted after the the dispatched operation.
  • B . The previously dispatched operation stays as is; the new operation is inserted before the the dispatched operation.
  • C . The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
  • D . The new operation is inserted at the desired time; the previously dispatched operation is moved backward.

Reveal Solution Hide Solution

Correct Answer: D
Question #2

Which information is required when you created a production master in SAP S/4HANA?

  • A . Selective screen for views
  • B . Product type
  • C . Base unit of measure
  • D . Industry sector

Reveal Solution Hide Solution

Correct Answer: A,B
Question #3

Why would you use phantom assemblies?

  • A . To simplify the structure of bills of materials
  • B . To make the assignment of components easier
  • C . To reduce the number of changes required in bills of materials
  • D . To reduce the number of material masters
  • E . To increase the number of planning levels

Reveal Solution Hide Solution

Correct Answer: A,B,C
Question #4

Which SAP application can be used for forcasting in Supply Chain Planning?

  • A . Material Requirements Planning (MRP)
  • B . Supply Chain Management(SCM)
  • C . Integrated Business Planning (IBP)
  • D . Capacity Requirements Planning (CRP)

Reveal Solution Hide Solution

Correct Answer: B,C
Question #5

For what production type are production orders used?

  • A . Process manufacturing processes
  • B . Replenishment controlled by control cycles
  • C . Discrete manufacturing processes
  • D . Period and quantity-oriented production

Reveal Solution Hide Solution

Correct Answer: C
Question #6

You want to reduce planning efforts for B/C materials .

Which planning procedure do you recommend?

  • A . Material requirements planning
  • B . Manual planning without check
  • C . Forecast planning
  • D . Consumption-based planning

Reveal Solution Hide Solution

Correct Answer: D
Question #7

You are working with planning strategy 40 (Planning-with-final assembly)

When does consuption of planned independent requirements take places?

  • A . When you deliver a sales order
  • B . When the MRP result are saved
  • C . When you create a sales order
  • D . When you create a planned order

Reveal Solution Hide Solution

Correct Answer: C
Question #8

An issue storage location was NOT found through the work center, bill of material (BOM) item, or material master .

What determines whether the storage location can be derived from the production version?

  • A . MRP group
  • B . Plants parameters
  • C . MRP controller
  • D . MRP profile

Reveal Solution Hide Solution

Correct Answer: A
Question #9

How can you achive a feasible production plan in case of capacity constraints?

  • A . Select an alternative mode on a resource.
  • B . Adjust the available capacity.
  • C . Reduce the planning window
  • D . Form optimum sequence to reduce setup times
  • E . Execute an infinite production planning run

Reveal Solution Hide Solution

Correct Answer: A,B,D
Question #10

Which of the following is valid sequence of the main activities in production order processing?

  • A . Creation, availability check, release, material widrawal, confirmation
  • B . Creation, release, printing, goods issue, confirmation, goods receipt
  • C . Creation, printing, release, goods issue, confirmation, goods receipt
  • D . Creation, release, settlement, goods issue, confirmation, goods receipt

Reveal Solution Hide Solution

Correct Answer: A,B

Question #11

What is the difference between co-products and by-products?

  • A . Only co-products appear in the process or production order settlement rule.
  • B . Only co-products can be manufactured in isolation from the main product.
  • C . Only co-products are identified by a special item category in the bill of material (BOM).
  • D . Only by-products have a zero inventory valuation.

Reveal Solution Hide Solution

Correct Answer: A
Question #12

Where do you maintain the work center that represents the production line for repetitive manufacturing?

  • A . Production version
  • B . Routing
  • C . Repetitive manufacturing profile
  • D . Production cost collector

Reveal Solution Hide Solution

Correct Answer: A,B
Question #13

You want to use capacity availability checks for production orders .

Which settings have to be made for this?

  • A . A checking rule must be assigned in the checking control
  • B . The PRT Availability Check must be set in the checking control.
  • C . An overall profile must be assigned in the checking control.
  • D . The Relevant for Finite Scheduling indicator must be set

Reveal Solution Hide Solution

Correct Answer: C,D
Question #14

For a production version to be valid and consistent what requirements must be fulfilled?

  • A . The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • B . The assigned routing must NOT have alternative sequences.
  • C . The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
  • D . The lot size range must be within the lot-size range of the assigned routing.
  • E . The assigned routing must be a rate routing.

Reveal Solution Hide Solution

Correct Answer: A,C,D
Question #15

Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A . When multiple operations are maintained for one product
  • B . When alternate resources are used within one operation
  • C . When multiple planned orders exist on one resource
  • D . When multiple production versions are maintained for one product

Reveal Solution Hide Solution

Correct Answer: B
Question #16

What does the material type influence?

  • A . Which plant specific status is allowed
  • B . Which material master views can be maintained
  • C . Which document types are allowed
  • D . Whether the material is produced in-house, procured externally or bouth

Reveal Solution Hide Solution

Correct Answer: B,D
Question #17

What type of time element can be reduced by strategy settings while dispatching?

  • A . Transportation time
  • B . Wait time
  • C . Queue time
  • D . Setup time

Reveal Solution Hide Solution

Correct Answer: B,C
Question #18

How can you limit the validity of a bill of material (BOM)?

  • A . By plant
  • B . By material type
  • C . By industry
  • D . By period

Reveal Solution Hide Solution

Correct Answer: A,D
Question #19

Your project used process orders for the production of liquid chemicals.

What can you define to ensure that the production flow happens only in physically connected tanks?

  • A . Operation network
  • B . Work center hierarchy
  • C . Setup matrix
  • D . Resource network

Reveal Solution Hide Solution

Correct Answer: B
Question #20

Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A . Non-stock item
  • B . Work item
  • C . Variable-size item
  • D . WBS item

Reveal Solution Hide Solution

Correct Answer: A,C

Question #21

Which item statuses can you select inside a material BOM?

  • A . Service
  • B . Sales
  • C . Quality management
  • D . Engineering

Reveal Solution Hide Solution

Correct Answer: B,D
Question #22

Your client is asking for your advice on material master numbering in SAP S/4HANA .

What do you need to consider?

  • A . The maximum mater all number length is 40 for external numbers and 18 for internal numbers
  • B . The number of leading zeros for internal numbers is client-specific.
  • C . In Customizing you can decide by material type whether to use the long material number.
  • D . The display template for material numbers applies to all clients.

Reveal Solution Hide Solution

Correct Answer: A,D
Question #23

Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?

  • A . First in first out (FIFO)
  • B . 100% check
  • C . Simultaneous
  • D . By usage probability

Reveal Solution Hide Solution

Correct Answer: B,D
Question #24

What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?

  • A . The work center has several invidula capacities.
  • B . The finite Scheduling indicator is NOT set in the strategy profile.
  • C . The Change Planning Direction indicator is set in strategy profile.
  • D . Alternative work centers are fully occupied.

Reveal Solution Hide Solution

Correct Answer: A,B
Question #25

You want to set up a make-to-order planing scenario for finished material. The bil of material contains two components: one should be procured for each sales order individually, the other one shold be procured jointly for all independent requirements. Forcasting for the finished product is NOT possible .

Which setting do you make to achive this?

  • A . Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Mixed MRP indicator
  • B . Choose planning strategy 20 (Make-to-order) and select corresponding Invidual/collective indicator
  • C . Choose planning strategy 20 (Make-to-order) and select corresponding Mixed MRP indicator
  • D . Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Invidual/collective indicator

Reveal Solution Hide Solution

Correct Answer: D
Question #26

What happens to this dependent requirement when you convert the planned order into a

production order?

  • A . They are converted into a schedule line.
  • B . They are converted into a reservation.
  • C . They are converted into a production order.
  • D . They are converted into a planned order.

Reveal Solution Hide Solution

Correct Answer: B
Question #27

You have maintained the parameters for simple discontinuation in the material master of a component .

Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

  • A . Production order release
  • B . Material requirements planning
  • C . Backflushing
  • D . Kanban

Reveal Solution Hide Solution

Correct Answer: B
Question #28

During production order creation, several valid production versions are found .

How does the system choose the production version?

  • A . Planned order or material number
  • B . Valid period or sale order
  • C . Alphanumeric or quota arrangement
  • D . Lot size or material cost

Reveal Solution Hide Solution

Correct Answer: C
Question #29

Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?

  • A . Create object selection variant for transportation lane-related alerts.
  • B . Create object selection variant for product-related alerts.
  • C . Assign the overall profile to the authorization profile.
  • D . Assign the alert profile to the overall profile.

Reveal Solution Hide Solution

Correct Answer: B,D
Question #30

What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?

  • A . Material Requirements Planning (MRP)
  • B . Capacity Requirements Planning (CRP)
  • C . Supply Network Planning (SNP)
  • D . Demand Planning (DP)

Reveal Solution Hide Solution

Correct Answer: A