SAP C_TS414_2023 SAP Certified Associate – SAP S/4HANA Cloud Private Edition, Quality Management Online Training
SAP C_TS414_2023 Online Training
The questions for C_TS414_2023 were last updated at Nov 15,2024.
- Exam Code: C_TS414_2023
- Exam Name: SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Quality Management
- Certification Provider: SAP
- Latest update: Nov 15,2024
Which type of inspection point exist in the system. (3 correct ans)
- A . Inspection point for equipment
- B . Inspection point for Physical sample
- C . Inspection point for incoming certificates
- D . Inspection point for defects recording
- E . Inspection point for functional location
Your customer wants material -dependent code selected from a catalog to show when a.
Where can you control and limit the codes?
- A . Catalog settings
- B . Product hierarchy
- C . Catalog profile
- D . Catalog groups
When creating an operation step in an inspection plan, which of the following is mandatory?
- A . Work center
- B . Standard text
- C . Control key
- D . Activity type
What type of task lists can the calibration planner assign to a maintenance plan to perform a calibration inspection? Note: 2 correct answer
- A . Functional location task list
- B . Inspection plan
- C . Equipment task list
- D . General task list
- E . Standard routing
Which inspection origin creates only unplanned physical samples?
- A . 2 goods issue
- B . 3 production
- C . 15 sample management
- D . 16 stability study
Which catalogue types require the use of selection sets? Correct 2
- A . Usage decision
- B . Defect type
- C . Characteristic
- D . Actions
- E . Tasks
During the production inspection, which elements does the system use to determine the layout of results and defects recordings? Note: 3 correct answer
- A . Report type
- B . Confirmation profiles
- C . Partner profiles
- D . Status profiles
- E . Code groups
How does the system handle equipment and functional locations in an inspection lot in calibration inspection?
- A . As a characteristic
- B . As physical sample
- C . As a material
- D . As a inspection point
Which business object must you use to create a stability study?
- A . Quality inspection lot
- B . Physical sample
- C . Quality notification
- D . Sample drawing procedure
Which of the following does the system automatically do when you complete a stability? Correct 3
- A . Trigger a subsequent stability Study
- B . Set the usage decision for all stability inspection lots
- C . Set the system status to completed
- D . Lock all the storage conditions
- E . Lock the test schedule