You require stock material to carry out maintenance tasks.
Which of the following statements regarding material planning in the maintenance order are correct? Note: There are 3 correct answers to this question.
- A . Material can be assigned at order header level.
- B . A control key for internal workforce is required when assigning stock material to an order operation.
- C . Material can be assigned at order operation level.
- D . The pick list for materials can be printed before order release.
- E . A goods receipt can be entered for a technically completed maintenance order.
Which objects have been enhanced with linear data in maintenance processes? Note:
There are 3 correct answers to this question.
- A . Work order confirmation
- B . Maintenance plan header
- C . Measurement document
- D . Maintenance plan item
- E . Equipment task list
Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question.
- A . Change the priority.
- B . Cancel status Released.
- C . Book a goods receipt.
- D . Change the estimated costs.
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.
- A . Scheduling period
- B . Factory calendar
- C . Start date
- D . Scheduling indicator
A piece of equipment cannot be linked to a material. Determine whether this statement is true or false.
- A . True
- B . False
You want to assign a maintenance planning plant directly to an organizational unit.
Which of the following units can you use?
- A . Maintenance work center
- B . Maintenance planner groups
- C . Location
- D . Controlling area
What can you assign in a notification item? Note: There are 2correct answers to this question.
- A . Only one object part
- B . One or more object parts
- C . One or more causes of damage
- D . Only one cause of damage
You want to set up a scenario for regular maintenance. The first event should take place after 1 year; after that, it is a regular cycle of 6 months.
Which parameter do you have to use to map this in the system?
- A . Shift factor
- B . Maintenance plan category
- C . Maintenance package offset
- D . Scheduling indicator
In which cases are projects (PS) used in the area of SAP S/4HANAAsset Management? Note: There are 2 correct answers to this question.
- A . Condition-based maintenance
- B . Investments
- C . Shutdowns and overhaul
- D . External refurbishment
Which parameter in the material master is a prerequisite for refurbishment?
- A . Valuation class 8000
- B . Valuation category C (condition-based)
- C . Valuation type H (origin)
- D . Valuation category B (in-house/external procurement)
What can be determined using the offset within a maintenancestrategy?
- A . The cycle duration
- B . The first due date of a maintenance package
- C . The start date of the maintenance order
- D . The call date for the maintenance order
You need to create a new functional location.
Which actions can you perform with the SAP Fiori app Create Technical Object? Note: There are 3 correct answers to this question.
- A . Edit classification data and characteristics.
- B . Change a reference location.
- C . Assign a subordinate piece of equipment.
- D . Assign documents.
- E . Create a measuring point.
How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct answers to this question.
- A . Via organizational unit and personal hourly rate
- B . Via activity type and hourly rate
- C . Via business partner and hourly price
- D . Via cost center and activity type
Which of the following can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question.
- A . Configuration
- B . Manufacturer data
- C . Serial data
- D . Warranty
Which of the following BOMs we use to set up spare parts planning of functional locations
- A . Maintenance BOM
- B . Costing BOM
- C . construction BOM
- D . Production BOM
Which statements related to the creation of maintenance orders arecorrect? Note: There are 2 correct answers to this question.
- A . The document within the document management system canbe assigned only at operational level.
- B . The long text of the reference notification can be automatically copied as the long text of the order.
- C . The assignment of the header notification to an order CANNO Tbe deleted.
- D . When an order is created based on a single notification, this notification becomes the header notification.
You want to have several plan dates calculated in a maintenance plan.
Which scheduling parameter do you use?
- A . Call horizon
- B . Lead float
- C . Scheduling period
- D . Scheduling indicator
Which steps support the maintenance technician in the Report and Repair Malfunction Fiori app (3 tiles)? Note: There are 3 correct answers to this question.
- A . Complete the malfunction report.
- B . Plan repair work for responsible work center.
- C . Assign production resource tool (PRT) to operation.
- D . Verify planned and actual costs
- E . Find malfunction records already created in a list.
You want to see historical information relating to the phases when equipment was installed at a functional location. Where can you find this information?
- A . Historical Orders list
- B . Structure Display
- C . Location Analysis list
- D . Usage list
Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question.
- A . Via the Manage Maintenance Order List SAP Fiori app
- B . Via the Change Maintenance Order SAP Fiori app
- C . Within the SAP Fiori-based background job
- D . Via the multi-level order list (SAP GUI)
In which of the following locations can object information can be found
- A . Din master record of technical object
- B . In document
- C . In Notification
- D . In Order
The planner adds non-stock material in a released maintenance order.
Which of the following statements regarding the purchasing process are correct? Note: There are 3 correct answers to this question.
- A . The maintenance order can be set to TECO before the invoice is created.
- B . A purchase order is created automatically as soon as the order is saved.
- C . A purchase requisition can be created automatically as soon asthe the order is saved.
- D . A goods receipt can be posted after the maintenance order is technically completed
- E . A goods receipt can ONLY be posted for a maintenance order with status REL.
You cancel the technical completion of a work order.
What are theeffects? Note: There are 2 correct answers to this question.
- A . Open purchase orders are recompiled.
- B . Open reservations are recompiled.
- C . Referenced notifications are put In Process again.
- D . Open purchase requisitions are recompiled
You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way torecord measurement documents.
What do you need to do? Note: There are 2 correct answers to this question.
- A . Assign a piece of equipment with an allocated measuring point to a task list operation.
- B . Assign an inspection lot to the task list header.
- C . Assign a measuring point as a production resources/tools(PRT) to a task list operation.
- D . Assign an inspection document as PRT to the task list operation.
Which of the following are components of cloud-based SAP Intelligent Asset Management? Note: There are 2 correct answers to this question.
- A . SAP Work Manager
- B . Worker safety applications
- C . SAP Asset Manager
- D . SAP Predictive Maintenance and Service
Which functionalities are available in the SAP Asset Manager fora maintenance worker? Note: There are 2 correct answers to this question.
- A . Display maps. Display and maintain technical objects
- B . Change BOM. Create a work order on the ESRI map
- C . Schedule resources. Change task list
- D . Confirm time sheets. Attach documents
In which maintenance object can you use an activity type? Note: There are 2 correct answers to this question.
- A . Maintenance order operation
- B . Maintenance order header
- C . Notification activity
- D . Work center
Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note: There are 3 correct answers to this question.
- A . Display approved purchase requisitions for which purchase orders have been generated.
- B . Display approved purchase requisitions for which NO purchase orders have been generated.
- C . Analyze maintenance orders that are still in planning andhave NOT been released.
- D . Analyze overdue maintenance orders that have NOT been finally confirmed.
- E . Analyze confirmed maintenance orders that have NOT been settled.
Which statements regarding a maintenance order with status RELare correct? Note: There are 3 correct answers to this question.
- A . The planner can change estimated costs only at header level.
- B . Shop papers can only be printed after the order release.
- C . Goods receipts for external services can be entered.
- D . The controller can determine actual cost surcharges.
- E . The planner can change planned costs at operation level.
Which statement is correct about the SAP Fiori tile group? Note: There are 2 correct answers to this question.
- A . It can be assigned directly to the user via personalization.
- B . It is assigned via a portal role.
- C . lt provides only SAPUI5-based apps.
- D . It is based on an SAP Fiori tile catalog.