You require stock material to carry out maintenance tasks.
Which of the following statements regarding material planning in the maintenance order are correct? Note: There are 3 correct answers to this question.
- A . Material can be assigned at order header level.
- B . A control key for internal workforce is required when assigning stock material to an order operation.
- C . Material can be assigned at order operation level.
- D . The pick list for materials can be printed before order release.
- E . A goods receipt can be entered for a technically completed maintenance order.
Which objects have been enhanced with linear data in maintenance processes? Note:
There are 3 correct answers to this question.
- A . Work order confirmation
- B . Maintenance plan header
- C . Measurement document
- D . Maintenance plan item
- E . Equipment task list
Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question.
- A . Change the priority.
- B . Cancel status Released.
- C . Book a goods receipt.
- D . Change the estimated costs.
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.
- A . Scheduling period
- B . Factory calendar
- C . Start date
- D . Scheduling indicator
A piece of equipment cannot be linked to a material. Determine whether this statement is true or false.
- A . True
- B . False
You want to assign a maintenance planning plant directly to an organizational unit.
Which of the following units can you use?
- A . Maintenance work center
- B . Maintenance planner groups
- C . Location
- D . Controlling area
What can you assign in a notification item? Note: There are 2correct answers to this question.
- A . Only one object part
- B . One or more object parts
- C . One or more causes of damage
- D . Only one cause of damage
You want to set up a scenario for regular maintenance. The first event should take place after 1 year; after that, it is a regular cycle of 6 months.
Which parameter do you have to use to map this in the system?
- A . Shift factor
- B . Maintenance plan category
- C . Maintenance package offset
- D . Scheduling indicator
In which cases are projects (PS) used in the area of SAP S/4HANAAsset Management? Note: There are 2 correct answers to this question.
- A . Condition-based maintenance
- B . Investments
- C . Shutdowns and overhaul
- D . External refurbishment
Which parameter in the material master is a prerequisite for refurbishment?
- A . Valuation class 8000
- B . Valuation category C (condition-based)
- C . Valuation type H (origin)
- D . Valuation category B (in-house/external procurement)