Which of the following statements about commitments management are correct?
- A . Commitment values can exceed planned costs.
- B . Commitments lead to actual costs as a result of various business transactions.
- C . Commitments are contractual obligations that are entered in accounting.
- D . Commitments are used to update and monitor resources that are required for external procurement.
- E . Commitment data is built up when the scheduled order resources are valuated.
Which of the following areas are available in SAP S/4HANA?
- A . Concur
- B . Marketing
- C . SuccessFactors Employee Central
- D . Enterprise Management
What is a caracteristics of the SAP Fiori tile group? choose 1 answer
- A . it is assigned using the set/get parameteres
- B . it provide an invisible group of SAP Fiori catalogs
- C . it shows active tiles in SAP fiori launchpad
- D . it is a building block of the SAP fiori catalog
With SAP S/4HANA embedded analytics, which tools are aimed at end users?
- A . Analytical SAP Fiori applications
- B . SAP Smart Business cockpits
- C . Design Studio
- D . Query Designer
- E . Query Browser
Two maintenance package of a maintenance strategy are due at the same time .
Which parameter determine that only one of these maintenance package is executed? choose 1 answer
- A . hierarchy
- B . package sequence
- C . offset
- D . lead float
Which of the following pieces of information are available in the production order?
- A . Order components
- B . Order costs
- C . Production dates
- D . Production instructions
- E . All of the above
- F . None of the above
During the implementation project, you need to define the organizational units .
Which of the following objects can you directly assign a maintenance plant?
- A . location
- B . maintenance planner group
- C . controlling area
- D . maintenance work center
Which one of the following relationship types means that the end of one operation is linked to the start of the next operation?
- A . Start – Start
- B . Finish – Finish
- C . Finish – Start
- D . Start – Finish
What is a prerequisit to start a performance-based maintenance plan? choose 1 answer
- A . cycle modification factor
- B . call horizon
- C . intial measurement document
- D . scheduling period
Which object combination influences the display of the fleet-specific tab strip and fields? choose 1 answer
- A . equipement category and measuring point category
- B . fleet object type and vehicle usage indicator
- C . equipment category and fleet object type
- D . fleet object type and measuring point category