At what level does the system calculate costs of maintenance orders? choose 1 answer
- A . always on header level depending on the maintenance plant
- B . always on operation level depending on the order type and the maintenance planning plant
- C . on header level or on operation level depending on the order type and the maintenance planning plant
- D . on header level or on operation level depending on the controlling view
Which periode does the planner define when using the scheduling period in the maintenance plan? choose 1 answer
- A . the period in which the system job for scheduling runs
- B . the period for which orders are created in advance
- C . the period in which a shift of planned dates is allowed
- D . the period for which the system generate planned or call dates
Name the manufacturing execution process step that allows someone to enter the actual time and activities of the various operations during the production process.
- A . Costing
- B . Disaggregation
- C . Material requirements planning
- D . Confirmation
Inspections and repair work requiring the shutdown of an entire asset is performed atregular intervals can be handled using__________________.
- A . Project-Oriented Maintenance
- B . Preventive Maintenance
- C . Corrective Maintenance
- D . ABreakdown Maintenance
When the planner adds a stock material in the orders, which activities are performed next in relation to the order? choose 3 answers
- A . perform the availablity check
- B . post the goods receipt
- C . post the goods issue
- D . create the purchase order
- E . print the material provision
What are the prerequisits to run SAP Work manager? choose 3 answers
- A . Mobile add-on for SAP S/4 HANA
- B . Sysbase unwired platform
- C . SAP mobile platform
- D . SAP Geographical enablement framework
- E . device operation system ( ios, andriod or windows )
You plan to use the integration of maintenance order and project system (PS) objects. to which PS objects can you assign a maintenance order? choose 2 answers
- A . network operation
- B . WBS element
- C . network header
- D . project definition
SAP S/4HANA is built to natively integrate with business networks such as:
- A . SAP Fieldglass
- B . SAP Concur
- C . Linkedin
- D . SAP Hybris
- E . SAP Ariba
How do you activate subscreen for equipement master data in customizing? choose 1 answer
- A . create a view profile and assign it to the equipement category
- B . create a screen group info type and assign the group to the equipment category
- C . assign object information parameter to the equipement category
- D . define the field selection for the equipment master data
The planner must add an activity to a notification which must be executed in the future .
Which option in the notification, that can be predefined in a catalog does the planner use? choose 1 answer
- A . an activity in the notification item
- B . a task in the notification header
- C . a text in the notification item
- D . a text in the subject long text screen
what is primary goal of sap perdictive maintenence and service? choose 1 answer
- A . to precalculate maintenance projects
- B . to provide advanced cost controlling analysis
- C . to create a cloud-based equipement directory
- D . to collect and analyze machine data
You would like to preset a value for a field that you have to enter frequently. To do this, you need the parameter ID .
Which help function would you use to locate the parameter ID when you are on the field?
- A . F4
- B . F1
- C . F11
- D . Application help
- E . System help
Which feature does SAP S/4HANA include? choose 2 answer
- A . unchanged data model
- B . in-memory platform
- C . support of any database
- D . SAPUI5-Based UI
The planner add a stock material in the orders .
What does the system create reservation depending on the settings of the order type? choose 2 answers
- A . after the available check is performed
- B . when the order is released
- C . when the order is saved
- D . when the cost are determined
Which of the following is not a Customizing setting for order types?
- A . Structure indicator
- B . Settlement profile
- C . Planning plant
- D . Residence time
- E . Settlement rule
In which product does SAP deliver embedded analytics? choose 1 answer
- A . SAP Business warehouse
- B . SAP S/4HANA
- C . SAP Business intellignece
- D . SAP BW/4HANA
What are the effects when the planner release a maintenance order? choose 3 answers
- A . the planner can estimate costs
- B . the planner CANNOT change planned costs
- C . the planner can print the job papers
- D . the technician can record confirmations
- E . the warehouse clerk can post a goods issue
What must you maintain before you create the measuring point or counters for technical objects? choose 1 answer
- A . enter an annual estimate
- B . create a code group in the necssary catalog
- C . assign characterisics to classes
- D . create necssary characterisitics in the calssification system
Which operations can the responsible person preform after a maintenance order in technically completed? choose 3 answers
- A . lock or unlock the order
- B . create invoice receipt for delivered material
- C . change the planned cost
- D . change the settelement rule
- E . update the estimate cost
What is the purpose of the SAP GUI Bleize Theme? choose 1 answer
- A . create a similaire user experience as in SAP fiori launchpad
- B . make web dynpro app available for SAP GUI
- C . make SAPUI5 app available for SAP GUI
- D . create a simplified copy of a transaction
Why was the application code completely rewritten for SAP S/4HANA?
- A . To take advantage of the simpler data model
- B . SAP S/4HANA is now built with Java
- C . The optimized ABAP code that we developed for Suite on SAP HANA would not work with SAP S/4HANA
- D . To ensure that the code is optimized for SAP HANA
The maintenance engineer creates a singel cycle plan with the following parameters:
* the call object is maintenance order
* the indicator or seprate completion of maintenance call date is NOT set
* the indicator for completion requirement is NOT activated
* both shift factors are set to 100% .
Which date is relevant for the calculation for further planned dates for all objects? choose 1 answer
- A . planned date of the next call number
- B . completion date of maintenance plan
- C . technical completion date of the maintenance order
- D . basic finish date of the maintenance order
In cost control, which of the following represents a closed system for cost accountingpurposes?
- A . Company code
- B . Work center
- C . Controlling area
- D . Business area
Why do you create maintenance planner group? choose 1 answer
- A . to map a group of persons which plan maintenance budgets
- B . to map a group of persons responsible for maintenance plans
- C . to map a group of persons responsible for maintenance strategies
- D . to map a group of persons which plans maintenance activities for technical objects
What is the purpose of the initial and subsequent buffers in a maintenance strategy? choose 1 answer
- A . to set the call date
- B . to set the start date of the maintenance plan
- C . to set the start/end date of the maintenance order
- D . to set the planned date
You create a revision for a maintance event builder (MEB) scenario. which objects can manually assign to a revision? choose 2 answers
- A . automatically created maintenance order from a maintenance plan
- B . automatically created notification from a maintenance plan
- C . manually created notifications
- D . manually created maintenance orders
Which parameters are calcluated during shceduling of a performance-based maintenance plan? choose 2 answers
- A . planned date based on sum of counter readings
- B . monthly performance based on annual estimate
- C . daily performance based on on annual estimate
- D . planned date based on cycle and daily performance
You have several defective parts that you need to send to a subcontractor to get them refurbished, what must you do to trigger the external refurbishment order? choose 1 answer
- A . creat a manual purchase order and add the refuribshment order number
- B . create an external activity (PM 02) within the refurbishment order
- C . create a manual purchase requistion and add the refurbishment order number
- D . create an internal activity (PM 01) and add the defective mateiral as non stock component
Which valuation category do you use to refurish the material? choose 1 answer
- A . in-house/ external procurment
- B . retail
- C . origin
- D . condition-based
In the document management system, you can create new documents that contain information about equipment or repair instructions, and attach these to the maintenance order or operation.
- A . False
- B . True
Which of the following statements about commitments management are correct?
- A . Commitment values can exceed planned costs.
- B . Commitments lead to actual costs as a result of various business transactions.
- C . Commitments are contractual obligations that are entered in accounting.
- D . Commitments are used to update and monitor resources that are required for external procurement.
- E . Commitment data is built up when the scheduled order resources are valuated.
Which of the following areas are available in SAP S/4HANA?
- A . Concur
- B . Marketing
- C . SuccessFactors Employee Central
- D . Enterprise Management
What is a caracteristics of the SAP Fiori tile group? choose 1 answer
- A . it is assigned using the set/get parameteres
- B . it provide an invisible group of SAP Fiori catalogs
- C . it shows active tiles in SAP fiori launchpad
- D . it is a building block of the SAP fiori catalog
With SAP S/4HANA embedded analytics, which tools are aimed at end users?
- A . Analytical SAP Fiori applications
- B . SAP Smart Business cockpits
- C . Design Studio
- D . Query Designer
- E . Query Browser
Two maintenance package of a maintenance strategy are due at the same time .
Which parameter determine that only one of these maintenance package is executed? choose 1 answer
- A . hierarchy
- B . package sequence
- C . offset
- D . lead float
Which of the following pieces of information are available in the production order?
- A . Order components
- B . Order costs
- C . Production dates
- D . Production instructions
- E . All of the above
- F . None of the above
During the implementation project, you need to define the organizational units .
Which of the following objects can you directly assign a maintenance plant?
- A . location
- B . maintenance planner group
- C . controlling area
- D . maintenance work center
Which one of the following relationship types means that the end of one operation is linked to the start of the next operation?
- A . Start – Start
- B . Finish – Finish
- C . Finish – Start
- D . Start – Finish
What is a prerequisit to start a performance-based maintenance plan? choose 1 answer
- A . cycle modification factor
- B . call horizon
- C . intial measurement document
- D . scheduling period
Which object combination influences the display of the fleet-specific tab strip and fields? choose 1 answer
- A . equipement category and measuring point category
- B . fleet object type and vehicle usage indicator
- C . equipment category and fleet object type
- D . fleet object type and measuring point category
Which of the following objects can you directly assign when you define the work center master record? choose 2 answers
- A . calculation key
- B . business partner
- C . capacity category
- D . orgnaizational unit
Which of the following provides general information on the SAP system and transaction or task on which you are working?
- A . Menu path
- B . Role bar
- C . Application toolbar
- D . Status bar
Which of the following are true statements about master data?
- A . Master data is organized into views that are assigned to organizational elements.
- B . Master data is created centrally and is available to all applications and allauthorized users.
- C . Master data decreases data redundancy.
Which of the following is true about SAP Asset Intelligence Network cloud application?
- A . It is the target of the application to maintain a global directory of pieces ofequipment, that uses general definitions.
- B . A remote service technician is a typical user of this application.
- C . It is the target of the application, to improve the visibility of machines.
- D . A constructing engineer is the typical user of this application.
Where can the planner check the material availbility? choose 3 answer
- A . within the SAP fiori-based background job
- B . from the list of orders
- C . within an individual order
- D . within the SAP fiori-based material document overview
- E . from the reservation list
What does the structure indicator define? choose 2 answers
- A . the field selection for the functional location list
- B . the cateogry of the functional Icoation
- C . the allowed characters for a functional location
- D . the hierarchy levels of the functional location structure
Which of the following statements about configuring the notification screen are correct?
- A . You can apply a simple view or an enhanced view to each notification type.
- B . You can define only one screen area per tab.
- C . You can assign internal headings and symbols to tabs.
- D . You can choose from 27 different tab pages for each notification type.
In which object can you change the offset of a maintenance plan strategy? choose 1 answer
- A . maintenance package
- B . maintenance plan header
- C . maintenance plan item
- D . maintenance plan category
You use SAP Work manager .
Which operation can the maintenance worker execute? choose 2 answer
- A . change BOM
create work order on the ESRI map - B . create notification
crearte a measuring reading - C . scheduling resources
change task list - D . create equipment
install equipment
what can planner monitor with the resource scheduling for maintenance planner sap fiori app? choose 2 answers
- A . workload of wok centers
- B . maintenance order NOT confirmed
- C . Notification without maintenance orders
- D . non-available stock materials