At what level does the system calculate costs of maintenance orders? choose 1 answer
- A . always on header level depending on the maintenance plant
- B . always on operation level depending on the order type and the maintenance planning plant
- C . on header level or on operation level depending on the order type and the maintenance planning plant
- D . on header level or on operation level depending on the controlling view
Which periode does the planner define when using the scheduling period in the maintenance plan? choose 1 answer
- A . the period in which the system job for scheduling runs
- B . the period for which orders are created in advance
- C . the period in which a shift of planned dates is allowed
- D . the period for which the system generate planned or call dates
Name the manufacturing execution process step that allows someone to enter the actual time and activities of the various operations during the production process.
- A . Costing
- B . Disaggregation
- C . Material requirements planning
- D . Confirmation
Inspections and repair work requiring the shutdown of an entire asset is performed atregular intervals can be handled using__________________.
- A . Project-Oriented Maintenance
- B . Preventive Maintenance
- C . Corrective Maintenance
- D . ABreakdown Maintenance
When the planner adds a stock material in the orders, which activities are performed next in relation to the order? choose 3 answers
- A . perform the availablity check
- B . post the goods receipt
- C . post the goods issue
- D . create the purchase order
- E . print the material provision
What are the prerequisits to run SAP Work manager? choose 3 answers
- A . Mobile add-on for SAP S/4 HANA
- B . Sysbase unwired platform
- C . SAP mobile platform
- D . SAP Geographical enablement framework
- E . device operation system ( ios, andriod or windows )
You plan to use the integration of maintenance order and project system (PS) objects. to which PS objects can you assign a maintenance order? choose 2 answers
- A . network operation
- B . WBS element
- C . network header
- D . project definition
SAP S/4HANA is built to natively integrate with business networks such as:
- A . SAP Fieldglass
- B . SAP Concur
- C . Linkedin
- D . SAP Hybris
- E . SAP Ariba
How do you activate subscreen for equipement master data in customizing? choose 1 answer
- A . create a view profile and assign it to the equipement category
- B . create a screen group info type and assign the group to the equipment category
- C . assign object information parameter to the equipement category
- D . define the field selection for the equipment master data
The planner must add an activity to a notification which must be executed in the future .
Which option in the notification, that can be predefined in a catalog does the planner use? choose 1 answer
- A . an activity in the notification item
- B . a task in the notification header
- C . a text in the notification item
- D . a text in the subject long text screen