How can you update the degree of processing for an activity?
- A . By using results analysis
- B . By changing the activity
- C . By scheduling the activity
- D . By confirming the activity
Your customer wants to use requirements grouping in SAP Project System.
What are the prerequisites for requirements grouping of materials? Note: There are 2 correct answers to this question
- A . The materials must allow sales order or project stock
- B . The exact lot size procedure must be used
- C . The procurement type of the material must be internal
- D . An MRP group must be assigned
Project Structure
You plan double the work on each internal activity for multiple project.
What do you recommend?
- A . Use mass change (CNMASS) in the project system.
- B . Double the work of each internal activity, one after another, in the project Builder.
- C . Double the capacity in the work center.
- D . Use mass change within the project Builder (CJ20N).
What PPIDS master data is necessary for using PP/DS? Note: There are 2 correct answers to this question
- A . Location
- B . Material
- C . Production version
- D . Resource
Which of the following is visible in the project planning board? Note: There are 2 correct answers to this question
- A . Project-relevant purchase orders
- B . Capacity requirements
- C . Maintenance orders assigned to an activity
- D . Production orders assigned to WBS elements
Which statements describe planned and actual revenue for WBS elements? Note: There are 2 correct answers to this question
- A . Planned revenue requires a sales order assigned to a WBS element
- B . Planned revenue can be transferred from a sales quotation
- C . Actual revenue is posted via a billing plan assigned to a WBS element
- D . Actual revenue is posted via a billing document created from a sales order
Dates
You want to exchange data between SAP Project System and Microsoft
What interface do you use?
- A . The EPS interface (External Project Software).
- B . No interface to Microsoft Project is available.
- C . The catalog interface.
- D . you do not need and interface. You can exchange data using object link.
Which of the following statements are true? Choose the correct answers. There are 2 correct answers to this question.
- A . You can map a project using only one WBS or one network.
- B . You can also represent a project using a WBS and one or more networks.
- C . You can create a project based on a Activity.
- D . You cannot use the characteristics of both the structures (WBS and Networks) together to represent a project.
Cost & Budget.
A customer wants to allocate overhead rates to a WBS element.
What must you assign to the WBS element?
- A . Settlement rules
- B . Costing Sheet
- C . Investment profile.
- D . Results analysis key
Cost & budget
A service Company use project management and they complain that the system does not prevent their project manager from exceeding their budget.
What action do you have tsolve the problem?
- A . Activate availability control For projects in the control area. Enter the plan data for each WBS element.
- B . Activate availability control for the important WBS element. Define the tolerance limit on each WBS element.
- C . Activate availability control in the assign budget profile. Defined the tolerance limit in the customizing.
- D . management in the project definition. Enter the budget in the master data of the top WBS element.
- E . Activate commitment