The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?
- A . Planned date of the next call, independent of maintenance order dates
- B . Actual finish date of the maintenance order
- C . The date of the final confirmation
- D . Technical completion date of the maintenance order
To which objects can a personnel number be directly assigned? Note: There are 2 correct answers to this question?
- A . Planner group
- B . Maintenance plan
- C . Work center
- D . Business partner
What are characteristics of the Preparation and Scheduling phase within phase-based maintenance? Note: There are 2 correct answers to this question
- A . If you use the Resource Scheduling apps, you always dispatch orders and operations.
- B . The order moves to the Preparation phase once it is approved and released
- C . Maintenance Planning Buckets give you a list of non-approved notifications
- D . The configuration of the order type decides whether you use Resource Scheduling or not.
Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 2 correct answers to this question
- A . Lock or unlock the order
- B . Update the estimated costs
- C . Change the settlement rule
- D . Change the planned costs
Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question?
- A . Via the SAP Fiori app "Manage Maintenance Order List"
- B . Within the SAP Fion-based background job
- C . Via the SAP Fiori app "Maintenance Scheduling Board"
- D . Via the SAP Fiori epp "Manage Maintenance Planning Buckets"
What do you need to configure to enable entries in the action log of a piece of equipment?
- A . Define history related fields in the usage period customizing.
- B . Activate the change documents for the equipment category.
- C . Define the corresponding history related field for the equipment reference category.
- D . Activate the change documents for the equipment reference category.
Which activities can the technician perform with the Report and Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to this question
- A . Schedule
• Dispatch - B . Release
• Print - C . Complete
• Close Report - D . Release
• Start Work
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers
to this question.
- A . Scheduling period
- B . Start date
- C . Scheduling indicator
- D . Factory calendar
The planner adds non-stock material in a released maintenance order.
What are possible options within the maintenance order? Note: There are 3 correct answers to this question?
- A . A purchase requisition can be created automatically as soon as the order is saved.
- B . The maintenance order can be set to TECO before the invoice is created
- C . A goods receipt can be posted after the maintenance order is technically completed.
- D . A purchase order is created automatically as soon as the order is saved.
- E . A purchase requisition will ALWAYS be created as soon as the order is saved.
Which settings must be customized to set up Inspection Checklist processing? Note: There are 2 correct answers to this question
- A . Maintain settings at plant level for usage decisions.
- B . Create a control key which expects inspection characteristic assignments
- C . Assign an Inspection Type to a Maintenance Order Type and a Planning Plant
- D . Assign an Inspection Type to a Maintenance Order Type.