Exam4Training

SAP C_IBP_2311 SAP Certified Application Associate – SAP IBP for Supply Chain (2311) Online Training

Question #1

How many different time levels can be selected within one planning view?

  • A . Only time levels from the base planning level of selected key figures
  • B . All time levels available in the time profile, restricted by global configuration parameter
  • C . All time levels available in the time profile
  • D . The number of time levels is restricted to four to avoid negative effects on performance

Reveal Solution Hide Solution

Correct Answer: B
Question #2

You need to define a new logic for a key figure to drive values from the PERPRODCUSTREGION level to the PERPRODCUST level.

Which of the following configuration options are possible for this process? Note: There are 2 correct answers to this question

  • A . Splitting the values from detailed to aggregated level by using a copy operator
  • B . Splitting the values from aggregated to detailed level using multiplication by the proportions
  • C . Splitting the values form aggregated to detailed level, based on the time profile attribute
  • D . Splitting the values from aggregated to detailed level, based on a stored split-factor key figure

Reveal Solution Hide Solution

Correct Answer: B, D
Question #3

You are setting up planning with lot sizes.

What are some of the properties of lot sizes that you need to beware of? Note: There are 2 correct answers to this question

  • A . Lot sizes are applicable for production and handling quantities.
  • B . Periodic lot size setting overrides the minimum lot size.
  • C . Lot size are time-independent master data settings
  • D . Lot size are applicable for production and transportation quantities

Reveal Solution Hide Solution

Correct Answer: C, D
Question #4

You need to work in two separate sessions for two different SAP IBP tenants.

What can help you differentiate the appearance of their user interfaces? Note: There are 2 correct answers to this question

  • A . Define a different default planning area via the User Preferences
  • B . Have a different set to tiles in the Home group of apps
  • C . Set a separate theme for the Home page in the Web UI.
  • D . Add the system name and tenant information from the About section to the Home pages

Reveal Solution Hide Solution

Correct Answer: B, C
Question #5

Which Master Data Types are used in time-series-based planning within SAP IBP for response and supply? Note: There are 3 correct answers to this question

  • A . DS Order fulfilment
  • B . Transportation Lane
  • C . Customer
  • D . Location
  • E . Product

Reveal Solution Hide Solution

Correct Answer: C, D, E
Question #6

You are implementing a demand process in SAP IBP for sales and operations, and consider using the standard forecast key figures available in the sample planning area SAPIBP1.

What are the first and last key figures in the logical progression of demand in the S&OP process?

  • A . Local Demand Plan first and Combined Final Demand last
  • B . Statistical Forecast Qty first and Consensus Demand Plan Qty last
  • C . Local Demand Plan first and Consensus Demand Plan Qty last
  • D . Statistical Forecast Qty first and Global Demand Plan Qty for SOP last

Reveal Solution Hide Solution

Correct Answer: A
Question #7

What does ABC/XYZ segmentation allow you to do? Note: There are 2 correct answers to this question

  • A . Substitute missing values in case of sporadic demands.
  • B . Choose time-independent key figures as segmentation measures
  • C . Identify inventory items that quire closer attentions
  • D . Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B"

Reveal Solution Hide Solution

Correct Answer: B, C
Question #8

Which processes are running in sampl to this question.

  • A . Supply and Allocation Planning
  • B . Inventory Optimization
  • C . Response Planning
  • D . Demand Sensing
  • E . Sales and Operation planning

Reveal Solution Hide Solution

Correct Answer: B, D, E
Question #9

Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)? Note: There are 3 correct answers to this question

  • A . Adjusted transportation receipts
  • B . Aggregated constraints
  • C . Maximum lot size
  • D . Transportation lead time
  • E . Minimum lot size

Reveal Solution Hide Solution

Correct Answer: A, D, E
Question #10

You are reviewing the master data types that are often used for supply and inventory planning.

Which master data types are compound master data types? Note: There are 2 correct answers to this question

  • A . SOURCEPRODUCTION
  • B . SOURCECUSTOMER
  • C . SOURCELOCATION
  • D . SOURCECUSTGROUP

Reveal Solution Hide Solution

Correct Answer: B, C

Question #11

Which options can be used to reduce the runtimes of a time-series optimizer run? Note: There are 3

correct answers to this question.

  • A . Keep the number of fairshare segments small
  • B . Split into multiple planning areas to support weekly vs. daily planning needs.
  • C . Use non-overlapping networks by using Subnetworks ID maintained at Location-Products to reduce the size of the problem
  • D . Eliminate the usage of telescopic time buckets
  • E . Increase the use of incremental lot size beyond the frozen horizon.

Reveal Solution Hide Solution

Correct Answer: A, C, D
Question #12

What is an example of a commonly used time-independent key figure?

  • A . A Special key figure marked as an aggregate key figure (aggregate constraint)
  • B . A unit of measure key figure, such as UoM Conversion Factor
  • C . Any attribute as a key figure
  • D . A currency conversion key figure, such as Exchange Rate

Reveal Solution Hide Solution

Correct Answer: C
Question #13

What is an example of a commonly used time-independent key figure?

  • A . A Special key figure marked as an aggregate key figure (aggregate constraint)
  • B . A unit of measure key figure, such as UoM Conversion Factor
  • C . Any attribute as a key figure
  • D . A currency conversion key figure, such as Exchange Rate

Reveal Solution Hide Solution

Correct Answer: B, C
Question #14

You are starting a new implementation project for SAP IBP and are considering the possible system architecture.

What are the possible approaches for setting up the system landscape? Note: There are 2correct answers to this question

  • A . Setup the two-tier landscape and have the configuration for development system regularly ― updated from the production system
  • B . Create additional planning areas in the test system to support training needs.
  • C . Create additional test planning areas in the production system to support cutover needs
  • D . Set up a three-tier landscape using transport, starting from the development system to test and ― production

Reveal Solution Hide Solution

Correct Answer: B, D
Question #15

What are some of the capabilities of the Planner Workspaces app? Note: There are 2 correct answers to this question.

  • A . It supports simulating the effect of the changes
  • B . It supports favourites created in SAP IBP, add-in for Microsoft Excel
  • C . It supports embedding analytic stories as a workspace component
  • D . It supports sharing with other users or user groups.

Reveal Solution Hide Solution

Correct Answer: B, C
Question #16

Which of the following conditions are relevant for subtotals in the planning view? Note: There are 2 correct answers to this question.

  • A . The total value can be added before or after the selected attribute
  • B . The Total number of the attribute that can use subtotal in the planning view can be restricted
  • C . The values of the attribute-based total at the highest attribute level in the planning level can be ― changed
  • D . Only attribute-based totals can be added to the planning view.

Reveal Solution Hide Solution

Correct Answer: A, B
Question #17

Manage Analytics Stories introduces advanced visualization features within SAP Integrated Business Planning for Supply Chain.

What are some of the main capabilities of the stories? Note: There are 3 correct answers to this question.

  • A . Links to the external URLs can be embedded in the story.
  • B . The story is structured around one responsive page
  • C . Specific chart and table filters can be applied within the story
  • D . Stories must be re-created in each SAP IBP environment.

Reveal Solution Hide Solution

Correct Answer: A, C, D
Question #18

What option is available for the key figure that is enabled for fixing?

  • A . Fixing is possible for key figures with negative values
  • B . Fixing is possible for a part of key figure value on a certain planning level
  • C . You can change a fixed key figure only with administrative rights
  • D . Fixing is possible for certain period, Including all child values in the hierarchy

Reveal Solution Hide Solution

Correct Answer: D
Question #19

You are adding a value-based filter to a planning view.

Which of the following conditions apply? Note: There are 2 correct answers to this question.

  • A . These filters can be used together with attributes totals in the same planning view
  • B . The alerts dashboard is not available if a value-based filter is set for the open planning view
  • C . You can add (or delete) planning objects to a planning view after these filters are applied
  • D . You can only apply one value-based filter per planning view.

Reveal Solution Hide Solution

Correct Answer: A, C
Question #20

You need to integrate data from SAP S/4HANA and legacy ERP to SAP IBP.

What are the integration tools that you can use with such a setup for data transfer? Note: There are 2 correct answers to this question.

  • A . SAP Cloud Integration for data services
  • B . SAP Smart data Integration
  • C . Core Interface
  • D . Real-time Integration

Reveal Solution Hide Solution

Correct Answer: A, B

Question #21

You create a planning filter using an SAP IBP Fiori app.

Which of the following objects can it be applied to? Note: There are 2 correct answers to this question.

  • A . Planning view template in the SAP IBP, add-in for Microsoft Excel
  • B . Jobs in the Application jobs app
  • C . Compare function in the Planning Areas app
  • D . Supply chain graph in Supply Chain Network app

Reveal Solution Hide Solution

Correct Answer: A, B
Question #22

You are modeling co-products in SAP Integrated Business Planning for Supply Chain.

What are some of the properties ofco-production you need to be aware of? Note: There are 2 correct answers to this question

  • A . The number of co-products that can be defined in the supply model is unlimited.
  • B . The output coefficient is time-dependent and should be modeled as a time series
  • C . The relationship between main product and co-product is specified in the production source of supply.
  • D . Co-production can be modelled only by supply optimizer and finite heuristics

Reveal Solution Hide Solution

Correct Answer: A, C
Question #23

Which Supply Planning processes are part of the tactical Planning level within a Planning Hierarchy? Note: There are 2 correct answers to this question.

  • A . Order Prioritization
  • B . Stock Replenishment
  • C . Inventory Build and Reduction
  • D . Balancing Supply and Demand

Reveal Solution Hide Solution

Correct Answer: C, D
Question #24

You are evaluating criteria for choosing the solver to support planning for a complex supply.

What are some of the points that should be reviewed? Note: There are 2 correct answers to this question.

  • A . Finite heuristics works with demand prioritization
  • B . Push and Pull production models are used by the optimizer
  • C . Prioritization of demand elements one by one is achieved by unconstrained heuristics
  • D . Planning results can be generated faster by the optimizer.

Reveal Solution Hide Solution

Correct Answer: A, B
Question #25

Which apps can be enhanced with analytical charts? Note: There are 2 correct answers to this question.

  • A . Web-based Planning
  • B . Intelligent visibility
  • C . Planner Workspace
  • D . Dashboards Advanced

Reveal Solution Hide Solution

Correct Answer: C, D
Question #26

You are implementing SAP IBP for sales and operations and are researching forecast mode algorithms.

What are some of the algorithms that can be used? Note: There are 2 correct answers to this question

  • A . Data-cleansing algorithms
  • B . Trend models algorithms
  • C . Sporadic demand models algorithms
  • D . Naive models algorithms

Reveal Solution Hide Solution

Correct Answer: B, D
Question #27

What are possible approaches to modeling a customer demand in time-series-based optimization with SAP IBP for response and supply? Note: There are 2 correct answers to this question.

  • A . Ensure discounting does not result in negative costs for each customer-product combination.
  • B . Assign a high cost value (1 million or more ) for non-delivery to priority customers
  • C . Ensure product prioritization with the combination of customer and product
  • D . Try to go as granular as possible with the customer product

Reveal Solution Hide Solution

Correct Answer: A, C
Question #28

You are configuring disaggregation for the KF 1 key figure in the Planning Areas Model Configuration app.

Which methods can you use? Note: There are 3 correct answers to this question

  • A . Disaggregation according to user-defined expression
  • B . Disaggregation according to an equal split
  • C . Disaggregation in batch triggered by an application job
  • D . Disaggregation according to a helper key figure
  • E . Proportional disaggregation by using KF2 in the expression

Reveal Solution Hide Solution

Correct Answer: A, B, E
Question #29

Which of the following key functions are supported by SAP IBP for sales and operations? Note: There are 2correct answers to this question

  • A . Allocation planning
  • B . Simple statistical forecast
  • C . Multi-Level Supply Planning Heuristics
  • D . SAP Product Lifecycle Management

Reveal Solution Hide Solution

Correct Answer: C, D
Question #30

What do you need to be aware of when using multiple pairs of key figures in one copy operator?

Note: There are 2 correct answers to this question.

  • A . Copying multiple key figures can be processed sequentially
  • B . Copying multiple key figures on different planning levels is not possible.
  • C . Necessary source key figures values are disaggregated.
  • D . Necessary target key figures value are disaggregated

Reveal Solution Hide Solution

Correct Answer: A, D
Exit mobile version