You created a key figure and want to add calculations.
Which of the following rules do you consider? Note: There are 2 correct answers to this question.
- A . Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.
- B . The calculation chain for a key figure must always result in a calculated key figure.
- C . Key figurescan be calculated across different planning levels.
- D . All key figure calculations have calculation inputs, which can be marked as stored or calculated.
Where can the results of a Time Series Analysis be used? Note: There are 2 correct answers to this question.
- A . During XYZ segmentation in the Manage ABC/XYZ Segmentation Rules app
- B . In Global (multi-stage) Inventory Optimization to calculate time-phased Recommended Safety Stock Outputs
- C . In the Manage Forecast Error Calculations app C Demand Planning app to calculatethe Forecast Error CV
- D . In the Microsoft Excel add-in, where you can use them to limit and filter your planning views
Model configuration allows the attributes of a master data type to be assigned as key figures.
Which features are relevant for this type of object?
- A . This type of key figure is not usually stored and it cannot be set to editable.
- B . This object is not exposed to the user in planning views or modeling.
- C . This object contains user-definedcriteria that monitor the running of business plans.
- D . This object provides a single value for a unique planning combination.
For which of the following application jobs can you enter planning filters as parameters? Note: There are 2 correct answers to this question.
- A . Purge Master Data
- B . Create Time Periods for Time Profiles
- C . Purge Key Figure Data
- D . Purge Non-Conforming Data
Which of the following conditions are relevant for subtotals in the planning view? Note: There are 2 correct answers to this question.
- A . The total number of attributes that can use subtotals in the planning view can be restricted.
- B . The values of the attribute-based total at the highest attribute level in the planning level can be changed.
- C . Only attribute-based totals can be added to the planning view.
- D . The total value can be added before or after the selected attribute.
You are adding a value-based filter to a planning view.
Which of the following conditions apply? Note: There are 3 correct answers to this question.
- A . You can only apply one value-based filter per planning view.
- B . The alerts dashboard is not available if a value-based filter is set for the open planning view.
- C . You can add (or delete) planning objects to a planning view after these filters are applied.
- D . These filters can be used together with attribute totals in the same planning view.
- E . These filters are always applied based on the values stored in the database.
Which of the following are features of the S&OP process templates? Note: There are 2 correct answers to this question.
- A . New instances of templates allow for re-use of the same processes.
- B . All process templates are assigned to dashboards.
- C . Each step depicted in the template can have tasks associated with it.
- D . The S&OP process step can be started with an application job.
You are configuring disaggregation for the KF1 key figure in the Planning Areas Model Configuration app.
Which methods can you use? Note: There are 3 correct answers to this question.
- A . Disaggregation according to a helper key figure
- B . Proportional disaggregation by using KF2 in the expression
- C . Disaggregation according to an equal split
- D . Disaggregation according to a user-defined expression
- E . Disaggregation in batch triggered by an application job
How can the SAP IBP scenario modeling functionality support business users in the S&OP planning cycle? Note: There are 2 correct answers to this question.
- A . Simulate heuristics run in Supply Reviewstage
- B . Simulate statistical forecast at the Demand Review stage
- C . Simulate demand sensing inputs for Supply Review
- D . Model inventory turns based on Target Safety stocks
You need to make manual adjustments to your S&OP plan.
Which are possible ways of making these changes? Note: There are 2 correct answers to this question.
- A . Using Microsoft Excel planning views
- B . Leveraging the web-based planning capability
- C . Leveraging the functionality of SAP Workzone
- D . Using Driver-Based planning
How many different time levels can be selected within one planning view?
- A . Only base time levels of the planning area
- B . All time levels available in the time profile
- C . All time levels available in the time profile, restricted by global configuration parameter
- D . Only time levels from the base planning level of selected key figures
You are working to realign the data due to a recent warehouse closure.
What should you be aware of in regards to the realignment steps settings? Note: There are 2 correct answers to this question.
- A . The name of the realignment step should be no longer than 20 characters.
- B . You must mark the realignment step as "shared" andassign the steps to users.
- C . The number of steps in the realignment run is limited to 255.
- D . A realignment step can change master data, planning objects and key figures.
The S&OP Operator Profiles app is used to configure different types of algorithms.
Which algorithm-specific settings are unique for only the Time Series-based Supply Optimizer? Note: There are 2 correct answers to this question.
- A . Time profile level
- B . Discretization
- C . Processing mode
- D . Global cost factors
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.
Which settings can you change and still run a successful consistency check? Note: There are 2 correct answers to this question.
- A . Add a new time profile level to the time profile.
- B . Change the numbering hierarchy of the period IDs in the time profile.
- C . Change the description of the attributes in the time profile.
- D . Change the past and future horizon of the levels in the time profile.
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.
Which of the following parameters can you model to plan production with extra shift(s)?
- A . Capacity expansion with additional costs
- B . Adjusted production interactive values
- C . Incremental production values
- D . Production source validity at the start of seasonal peak
What actions can be performed in the Advanced Dashboards application? Note: There are 3 correct answers to this question.
- A . Link two analytics charts.
- B . Rename the charts.
- C . Add process templates.
- D . Display all assigned analytics on a single UI.
- E . Use drill-down functionality.
What are the possible ways that an attribute intended for use as an attribute as a key figure can be created and assigned?
- A . Created as type NVARCHAR and assigned to an external master data type
- B . Created as type INTEGER and assigned to a compound master data type
- C . Created as type INTEGER and assigned to a simple master data type
- D . Created as type DECIMAL and assigned to a compound master data type
Which SAP IBP planning operator can be run to delete planning objects in a certain version?
- A . Purge Key Figure Data
- B . Purge Key Figure Data Outside Planning Area Planning Horizon
- C . Purge Non-Confirming Data
- D . Purge Master Data
What are the S&OP operator (optimizer) parameters associated with demand fair share?
- A . Number of fair share segments Additional tiering costs (default) Number of fair share segments late delivery
- B . Number of fair share segments Additional tiering costs (default) Inventory days of supply
- C . Number of fair share segments Maximum days of coverage Number of fair share
segments late delivery - D . Number of fair share segments Additional tiering costs (default) Maximum inventory
Forecast Error CV is an input to which of the following?
- A . Time-Series-Based Supply Planning Optimizer
- B . Calculate Target Inventory Components in Inventory Planning Profile Operator
- C . Forecast Error Calculation in Inventory Planning Profile Operator
- D . Multistage Inventory Optimization in Inventory Planning Profile Operator
You want to maintain key figure values for a new attribute and value combination, using SAP IBP, Add-in for Microsoft Excel, and are receiving an error related to missing combinations.
How can you resolve this problem? Note: There are 2 correct answers to this question.
- A . Use the Data Integration app to load suitable data that creates the combinations
- B . Use the Check Mode operator to create the combinations
- C . Use the option New Planning Object in the SAP IBP, add-in for Microsoft Excel
- D . Use the Manage Master Data app to create the combinations
A time profile is defined with these levels: day, technical week, week, month, quarter, and year.
What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?
- A . IF("PERIODID4" ="$$PERIODID4CU$$…)
- B . IF("PERIODID2" ="$$PERIODID2CU$$…)
- C . IF("PERIODID3" ="$$PERIODID3CU$$…)
- D . IF("PERIODID5" ="$$PERIODID5CU$$…)
Which of the following are inputs to Demand Sensing with Gradient Boosting (Full) algorithm? Note: There are 2 correct answers to this question.
- A . Sales Order Quantities (both historical and future open orders)
- B . Forecast Error CV Calculated by Manage Forecast Error Calculations app
- C . Future Consensus Forecasts and Lagged Forecast Snapshots
- D . Recommended Safety Stocks from Multistage Inventory Optimization
Which of the following solutions are feasible when using the time series supply optimizer? Note: There are 3 correct answers to this question.
- A . Violation of minimum resource utilization
- B . Not adhering to maximum transport values
- C . Not respecting production capacity
- D . Violation of minimum aggregated inventory values
- E . Not-fully satisfied demands
You are developing the functionality and appearance of the Excel UI for SAP IBP business users.
Which extensibility capabilities for SAP IBP, add-in for Microsoft Excel are provided by Custom VBA coding? Note: There are 2 correct answers to this question.
- A . Changing the member names
- B . Changing the layout of the master data workbooks
- C . Changing the entries from the Name Manager
- D . SAP IBP ribbon extension
Which are the mandatory preconditions for an attribute that can be used for saving the segmentation results? Note: There are 2 correct answers to this question.
- A . The Business Meaning of the attribute has been specified.
- B . The attribute should be a non-key attribute of the master data type.
- C . The attribute belongs to a simple or compound master data type.
- D . The attribute should be assigned to all planning levels.
Which pre-processing steps can be used to cleanse historical sales data before generating a statistical forecast in SAP IBP? Note: There are2 correct answers to this question.
- A . Substitute Missing with Mean or Median in Sales History
- B . Intermittency Detection and Correction in Sales History
- C . Promotion Sales Lift Elimination
- D . Bias Detection and Correction in Sales History
Which of the following are examples of time-independent key figures? Note: There are 2 correct answers to this question.
- A . A special key figure marked as an aggregate key figure (aggregate constraint)
- B . A currency conversion key figure, such as exchangerate
- C . A unit of measure key figure, such as UOMCONVERSIONFACTOR
- D . A forecast metric key figure, such FCSTMAPE
SAP IBP ensures interoperability with which applications? Note: There are 2 correct answers to this question.
- A . Salesforce Sales Cloud
- B . User management in SAP Success Factors
- C . Financial Planning in SAP Analytics Cloud
- D . Business Network in SAP Ariba
You are reviewing the master datatypes that are often used for supply and inventory planning.
Which master data types are compound master data types? Note: There are 2 correct answers to this question.
- A . SOURCELOCATION
- B . SOURCECUSTGROUP
- C . SOURCECUSTOMER
- D . SOURCEPRODUCTION