SAP C_IBP_2202 SAP Certified Application Associate – SAP IBP for Supply Chain (2202) Online Training
SAP C_IBP_2202 Online Training
The questions for C_IBP_2202 were last updated at Dec 19,2024.
- Exam Code: C_IBP_2202
- Exam Name: SAP Certified Application Associate - SAP IBP for Supply Chain (2202)
- Certification Provider: SAP
- Latest update: Dec 19,2024
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing .
Which of the following parameters can you model to plan production with extra shift(s)?
- A . Incremental production values
- B . Capacity expansion with additional costs
- C . Production source validity at the start of seasonal peak
- D . Adjusted production interactive values
Which of the following can be used as inputs for inventory level optimization? Note: There are 2 correct Answers to this question.
- A . Target inventory level
- B . Lead time variability
- C . Lot sizes
- D . Reorder point
Which of these conditions must be met to create a Local Member key figure?
- A . A key figure is created in the Planning Area app.
- B . Use Excel Cell References in Report Editor is selected.
- C . A key figure is selected in the Key Figures tab in the Microsoft Excel add-in.
- D . Activate Local Member Recognition is selected.
You have set up infinite S&OP heuristics for unconstrained planning .
What must you do to
model inputs as constraints? Note: There are 2 correct Answers to this question.
- A . Enter transportation lead times.
- B . Model adjusted transport receipts.
- C . Create product substitutions.
- D . Set minimum and maximum lot sizes.
Which of the following configuration options are part of the new key figure creation process? Note: There are 3 correct Answers to this question.
- A . Hiding or displaying totals for the key figure
- B . Enabling planning notes for the key figure
- C . Setting permitted planning levels
- D . Setting disaggregation logic for the key figure
- E . Enabling fixing for the key figure
What does ABC/XYZ segmentation allow you to do? Note: There are 2 correct Answers to this question.
- A . Assign more appropriate inventory algorithms to planning objects.
- B . Tailor your forecast strategy and inventory optimization to segment characteristics.
- C . Identify inventory items that require closer attention.
- D . Analyze forecast accuracy by product class.
While modeling for a large machine with high capital needs, you need it to run cost effectively with minimum utilization, even if it means producing more than demand .
Which solution would apply to this scenario? Note: There are 2 correct Answers to this question.
- A . Capacity leveling will be possible for production and storage resources.
- B . Excess stock can be generated and will need to be staged in an overflow warehouse.
- C . Enough demands can be pulled forward and pull production will occur.
- D . Balance can be achieved between excessive prebuild and minimum utilization by incorporating violation costs.
You are evaluating criteria for choosing the solver to support planning for a complex supply chain .
What are some of the points that should be reviewed? Note: There are 2 correct Answers to this question.
- A . Planning results can be generated faster by the optimizer.
- B . Prioritization of demand elements one by one is achieved by heuristics.
- C . Push and Pull production models are used by the optimizer.
- D . Finite heuristics can achieve demand prioritization and pegging.
Which of the following key functions are supported by SAP IBP for sales and operations? Note: There are 2 correct Answers to this question.
- A . Manual creation of feasible constrained plans
- B . Finite resource planning
- C . A basic demand planning process
- D . An advanced demand planning process
Which of the following data can be tracked using a change-history-enabled key figure? Note: There are 3 correct Answers to this question.
- A . Reason code
- B . Scenario ID
- C . Attributes
- D . Key figure type
- E . Modified date