On the Document Flow tab, check whether a freight unit was created? There are 2 correct answers to this question.
A . Verify that a freight unit has been created.
B . Open the Document Flow tab.
C . Optimize resource planning, scheduling, and allocation to boost service profitability
D . Adjust workforce schedules on the fly to keep up with changes in demand
Answer: A,B
Latest C_TM_95 Dumps Valid Version with 131 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund