In the event of a conflict between the Product Data Sheet and the Specification:

In the event of a conflict between the Product Data Sheet and the Specification:A . The Product Data Sheet prevailsB . The Specification prevailsC . It is up to the Inspector to decide which one to followD . It is up to the Applicator to decide which one to followView...

September 25, 2024 No Comments READ MORE +

The standards defining surface cleanliness achieved by centrifugal blast cleaning are:

The standards defining surface cleanliness achieved by centrifugal blast cleaning are:A . Different than air blast cleaningB . The same as air blast cleaningC . Slightly different to air blast cleaningD . Comparable to air blast cleaningView AnswerAnswer: B

September 24, 2024 No Comments READ MORE +

NACE No.13/ SSPC 6 identifies the use of:

NACE No.13/ SSPC 6 identifies the use of:A . Abrasive blasting onlyB . Watterjetting onlyC . Steam cleaning onlyD . Various methods of cleaningView AnswerAnswer: D

September 24, 2024 No Comments READ MORE +

The coating applicator has ignored a enface preparation hold point and applied coating over the surface without a sign off from you as the inspector.

The coating applicator has ignored a enface preparation hold point and applied coating over the surface without a sign off from you as the inspector. Your FIRST preferred course of action is to:A . Stop the jobB . Require the Applicator to remove the coatingC . Advise the Owner and...

September 24, 2024 No Comments READ MORE +

Individuals conducting Coating Surveys should:

Individuals conducting Coating Surveys should:A . Always be NACE Level 3 Certified InspectorsB . Always be NACE or SSPC Protective coating SpecialistsC . Always be experienced Specification WritersD . Always be trained and experienced Coating IndustryView AnswerAnswer: D

September 22, 2024 No Comments READ MORE +

You are working as the only in-house NACE Level 2 Inspector in a shop setting when an independent 3 rd party NACE Level 3 Inspector, representing the owner, presents you with a copy of a Non Conformance Report (NCR) he has written for a NACE2/SSPC SP 10 centrifugal blast which you had previously approved.

You are working as the only in-house NACE Level 2 Inspector in a shop setting when an independent 3 rd party NACE Level 3 Inspector, representing the owner, presents you with a copy of a Non Conformance Report (NCR) he has written for a NACE2/SSPC SP 10 centrifugal blast which...

September 21, 2024 No Comments READ MORE +

An Inspection and Test Plan is required when:

An Inspection and Test Plan is required when:A . It is always requiredB . When the Coating Applicator requests oneC . When the Owner specifies oneD . When the Inspector requests oneView AnswerAnswer: C

September 21, 2024 No Comments READ MORE +

The cost of qualified Coating Inspection is normally offset by:

The cost of qualified Coating Inspection is normally offset by:A . Lower Application CostsB . Lower Coating Life Cycle CostsC . Lower Safety Enforcement CostsD . Lower Supervision CostsView AnswerAnswer: B

September 20, 2024 No Comments READ MORE +

Eddy current DFT gauges are used to measure Dry Film Thickness in which of the following situations:

Eddy current DFT gauges are used to measure Dry Film Thickness in which of the following situations:A . Magnetic coatings applied to a magnetic metallic substrateB . Non-Conductive coatings applied to a conductive metallic substrateC . Conductive coatings applied to a magnetic metallic substrateD . Conductive coatings applied to a...

September 19, 2024 No Comments READ MORE +