You are the NACE Level 2 Coating Inspector where SSPC PA 2 has been specified with an additional requirement that no individual gauge reading shall be below a certain value.
As this is not part of the standard you should:
- A . Ignore the additional requirement
- B . Enforce the additional requirement
- C . Call your supervisor
- D . Request clarification from the specifier
The coating applicator has ignored a enface preparation hold point and applied coating over the surface without a sign off from you as the inspector.
Your FIRST preferred course of action is to:
- A . Stop the job
- B . Require the Applicator to remove the coating
- C . Advise the Owner and write a Non-Conformance report
- D . Ignore the situation
In the event of a conflict between the Product Data Sheet and the Specification:
- A . The Product Data Sheet prevails
- B . The Specification prevails
- C . It is up to the Inspector to decide which one to follow
- D . It is up to the Applicator to decide which one to follow
From a corrosion perspective, the main difference between Ferrous and Non-Ferrous Metals is:
- A . Cost
- B . Iron content
- C . Appearance
- D . Safety
You are the NACY Coating Inspector on a tank lining project where desiccant dehumidification is being used. Since the first shift of abrasive blasting your readings have indicated relative humidity below 40%; however on the second shift of coating application your readings are indicting 80%.
Your FIRST preferred course of action is to:
- A . Check to See if the dehumidification equipment is operating correctly
- B . Call your supervisor
- C . Advise the coating applicator supervisor of your readings
- D . Document the readings at the end of the shift
When environmental enclosures are being used an inspector needs to be concerned about:
- A . Lighting
- B . Air changes
- C . Structural integrity
- D . a), b), and c)
When observing design defects the NACE Inspector should:
- A . Document the defect and the potential problems that could result
- B . Ignore the defect as the inspector can’t change the design
- C . Request that the item be rebuilt with a better design for coating
- D . Stop the job immediately
When observing fabrication defects the NACE Inspector should:
- A . Require they be corrected prior to coating
- B . Consult the specification to determine how they should be treated
- C . Stop the job immediately
- D . Write an NCR and call the fabricator
WJ-1 is always performed using UHWJ at pressures above 210 MPa (30,000 PSI)
- A . True
- B . False