NACE NACE-CIP1-001 Coating Inspector Level 1 Online Training
NACE NACE-CIP1-001 Online Training
The questions for NACE-CIP1-001 were last updated at Nov 19,2024.
- Exam Code: NACE-CIP1-001
- Exam Name: Coating Inspector Level 1
- Certification Provider: NACE
- Latest update: Nov 19,2024
Checking is
- A . an exposed area of the substrate or previous coat material, caused by poor application technique.
- B . a fine crack in the surface of a coating that rarely reaches the substrate
- C . a very small hole in a coating caused when air or solvent is trapped in porous film and then escapes.
- D . surface breaks in the film that often result from grease or oil contamination and revel the substrate.
Inspection documentation is important because:
- A . It is the only deliverable item provided by the inspector
- B . Owners use the documentation for a variety of purposes
- C . a) only
- D . a) & b)
An inspectors personal log book should contain:
- A . Subjective comments re ding the application team
- B . Objective comments regarding the application work
- C . No comments regarding the application team
- D . The inspector’s personal opinions of the application team
You have just received your NACE CIP Level 1 certification when you are asked to supervise a team of uncertified field pipeline inspectors.
Your FIRST preferred course of action is to:
- A . Accept the assignment without hesitation
- B . Advise the prospective employer that you cannot accept the position
- C . Meet with the prospective employer to determine the scope of your role
- D . Review the NACE Attestation prior to making a decision
Good records can provide maintenance departments with detailed information about ALL of the following EXCEPT
- A . what items were coated.
- B . what materials were used.
- C . when the coating will be reapplied.
- D . how the item was coated.
Non Conformance Reports are completed by the Inspector:
- A . In every instance that an item does not meet the specification requirements
- B . When the Inspector deems it to be a significant non-conforming item
- C . When the Inspector and Contractor deem it to be a significant non-conforming item
- D . In accordance with the specification’s definition of a non-conformance
The initial steel condition is important to the NACE Inspector because:
- A . If the steel is pitted more coating will be required
- B . Less abrasive is need if the mill Scale s gone
- C . It affects the final appearance after blasting
- D . The Inspector may have to reject the Steel
The form of corrosion that has the largest potential for unexpected catastrophic failure is:
- A . General Corrosion
- B . Atmospheric Corrosion
- C . Galvanic Corrosion
- D . Localized Corrosion
What is used to determine compressed air cleanliness?
- A . Needle pressure gauge
- B . Psychrometer
- C . Blotter test
- D . Profilometer
Osmotic blistering is most likely to occur as a result of
- A . inadequate anchor pattern/surface profile.
- B . overcoating a surface contaminated with chemical salts.
- C . airless spray application
- D . applying tine coating too thin.
If you haven’t done the practical training, then you have to do it and pass the practical exam. Then you will take a (Computer Base Training)written exam online after. Once you pass this two stages, then you will get Certification, and a license to do inspection.
what more do I need to do to get nace level 1 inspector certification once I pass the online study and test? is there some other testing facility I will have to attend or am I immediately eligible to hire out and begin inspecting?